Camelot ES Classroom Addition

The 2011 bond program included funding to construct a new classroom and library addition at Camelot Elementary School and to provide building renovations at the existing campus. Construction of the new addition will replace eighteen portable classrooms with permanent classroom facilities. The design provides for construction of: (1) eighteen new classrooms, including 16 general purpose classrooms with integrated restrooms, and two ALE classrooms with an integrated restroom; (2) music classroom, office, and storage area; (3) library and media center; (4) computer lab; (5) new administrative, counseling, and clinic areas; (6) teacher resource and support areas; (7) covered walkways at the parent drop-off/pick-up area and bus loading/unloading area; (8) fire lane extension; (9) associated central plant expansion; (10) renovation of the existing administrative area into a central teacher workroom and family specialist program support area; and (11) site work, landscaping, irrigation, drainage, site utilities, and infrastructure improvements to complement the new facility addition. The total facility design program for the project equals 54,259 sq. ft., with 49,804 sq. ft. for the new facility addition and 4,455 sq. ft. for the campus renovation program.

Planning Estimate1: $15,250,000

Start Date: February 2014

End Date: November 2015

Architect: O'Connell Robertson
O'Connell Robertson - San Antonio

General Contractor: Bartlett Cocke General Contractors, Inc.
Bartlett Cocke General Contractors, Inc. - San Antonio

Pictures: Aerial/Architectural

Project Summary: (PDF Format)

Construction Bonds | CM&E Home

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.