Jackson MS Science Addition
The 2003 Bond Program includes funding for a Science Lab Facility: 8 Science Labs, 1 Centralized Chemical Storage Area, 3 Preparatory Storage Areas (1 adjacent to each Grade-Level), 2 Faculty Restrooms Upgraded, Science Department Offices (1 Office, 1 Workroom), Safety Equipment integrated in Labs and Prep Areas, Connect New One-Story Prototype Facility to existing Facilities through a Covered Walkway.
Planning Estimate1: $4,947,043
Start Date: March 2004
End Date: August 2005
Architect: Garza Bomberger & Associates
Architect: O'Neill Conrad Oppelt Architects Inc.
General Contractor: Bartlett Cocke General Contractors
Pictures: Aerial/Architectural
Project Summary:
- Bid Award Agenda Item (PDF)
- Bid Tab (PDF)
- Project Summary (PDF)
- Architectural Renderings (PDF)
- Site Plan (PDF)
- Floor Plans (PDF)
Construction Bonds | CM&E Home
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.