Walker Pool Facility Replacement
The 2015 Bond Program included funding to replace the BAC Walker Pool Facility. This design provided for construction of the following program elements: (1) demolition and full replacement of the existing building structure over the pool area with a new metal building; and (2) demolition and full replacement of the existing pool support facilities with a new 2-story facility, including: administrative area, coaches’ offices, wet classroom/ team room, athletic locker and dressing rooms (with public access/use), public restrooms, elevated bleacher seating (750 capacity), general pool storage area, mechanical-electrical-plumbing/custodial support areas, and an enclosed physical connection with the Josh Davis Natatorium on both levels. The overall design program for this project consisted of 44,995 sq. ft., with 29,920 sq. ft. for the pool swimming area metal building structure and 15,075 sq. ft. for the pool support facilities. Widening of the existing in-ground concrete pool by 5 yards and conversion of the concrete pool shell to a “Myrtha RenovAction System” were both included in the design as an accepted project bid alternate. This is the 1st Myrtha Pool System constructed in the greater San Antonio area. The pool design provides for a 50-meter long course and 25-yard short course supporting a variety of aquatics competitive events.
Planning Estimate1: $14,250,000
Start Date: November 2017
End Date: April 2019
Architect: Marmon Mok
General Contractor: Byrne Construction Services
Pictures: Aerial/Architectural
Project Summary:
- Schematic Design Approval (PDF)
- Board of Trustees Schematic Design Presentation - December 12, 2016 (PDF - 10 MB)
- Construction-Manager-at-Risk Selection Bid Award and Bid Tab (PDF)
- Construction-Manager-at-Risk Project Bid Authorization (PDF)
- Bid Award and Bid Tab (PDF)
- Time-lapse video - Filling Walker Pool
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.