Ridgeview ES Classroom Addition

The Ridgeview Elementary School Classroom Addition Project includes the following: (1) twenty-one (21) general purpose classrooms (~725 net sq. ft.), (2) two music rooms with storage areas replacing one music room located in a portable building and 1 music room located on the campus stage, (3) two restrooms adjoining each pair of general purpose classrooms per the standard elementary school prototype design, (4) supporting teacher resource areas consisting of a workroom, book storage area, faculty restrooms, and two resource rooms, (5) facility vestibule area and elevator, and (6) an athletic facility consisting of an oversized gymnasium with an athletic office, 2 storage areas and supporting general/public restroom areas to replace the existing metal gym along with a covered walkway connection from the new athletic facility to the new two-story academic building.

Planning Estimate1: $ 4,340,000

Start Date: April 30, 2005

End Date: July 2006

Architect: Lopez Salas Architects, Inc.
Lopez Salas Architects, Inc. - San Antonio

General Contractor: G.W. Mitchell & Sons, Inc.
G.W. Mitchell & Sons, Inc. - San Antonio

Pictures: Aerial

Project Summary: (PDF Format)

Construction Bonds | CM&E Home

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.