The North East Elementary School Walking Tracks Bid Package 1 project includes funding to construct new tracks at 8 elementary school campuses (Bulverde Creek, Canyon Ridge, Cibolo Green, Las Lomas, Roan Forest, Tuscany Heights, Vineyard Ranch, and Wilderness Oak ESs) as follows: (1) construct new 8 feet-wide, 675 feet-long walking tracks, with 2-inch porous-pave® walking surface over washed gravel base material and geogrid system; (2) integrated 6-inch porous-pave® header curbs; (3) accessible connecting pathway to the walking track; and (4) install landscaping to address all disturbed areas throughout the construction project.