2007 Bond Project: White Middle School
Fine Arts Addition


Project Completed
Project Details
Scope:
The Fine Arts project will construct a new band hall (6,575 gross sq.ft.) and renovate the existing band hall into an orchestra program area (2,150 gross sq.ft.).
Planning Estimate 1:
$ 1,275,000
Start Date:
June 9, 2008
End Date:
December 29, 2010
Photo Gallery:
Aerial Photos
Construction Photos
Architectural Photos - May 2011
Architect:
O'Neill Conrad Oppelt Architects, Inc.
O'Neill Conrad Oppelt Architects, Inc.
General Contractor:
Satterfield & Pontikes
Satterfield & Pontikes
Project Summary:
Property Map (PDF)
Bid Award Agenda Item (PDF)
Bid Tab (PDF)
Project Summary (PDF)
Architectural Rendering (PDF)
Site Plan (PDF)
Floor Plans (PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.