2007 Bond Project:
White Middle School
Fine Arts Addition
Scope: |
The Fine Arts project will construct a new band hall (6,575 gross sq.ft.) and renovate the existing band hall into an orchestra program area (2,150 gross sq.ft.). |
Planning Estimate 1: |
$ 1,275,000 |
Start Date: |
June 9, 2008 |
End Date: |
December 29, 2010 |
Photo Gallery: |
Aerial Photos Construction Photos Architectural Photos - May 2011 |
Architect: |
O'Neill Conrad Oppelt Architects, Inc. |
General Contractor: |
Satterfield & Pontikes |
Project Summary: |
Property Map (PDF) Bid Award Agenda Item (PDF) Bid Tab (PDF) Project Summary (PDF) Architectural Rendering (PDF) Site Plan (PDF) Floor Plans (PDF) |
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.