2010 QSCB Project:
Facility Maintenance Stage Lighting System Upgrades

Project Completed
Project Details
Scope:
Facility Maintenance Stage Lighting System Upgrades Project will upgrade 11 District campuses including: Churchill, Johnson, Lee, Madison, MacArthur, Reagan, and Roosevelt High Schools; and Driscoll, Krueger, Nimitz, and Wood Middle Schools. Each District high school will be retrofitted with new LED stage light fixtures. These new LED fixtures will improve the quality and flexibility of the theatrical lighting systems at each of the District’s high school auditoriums, while achieving savings in energy costs and bulb replacement maintenance. A portion of the traditional stage lighting systems (replaced by the LED lights) removed at each high school campus will be repurposed to selected middle school auditoriums. Additionally, at each of the selected middle schools, obsolete dimmer racks will be replaced, additional dimmer circuits will be provided, existing electrical infrastructure will be upgraded, additional secondary battens will be installed, and new lighting control consoles will be provided.
Planning Estimate 1:
$ 575,000
Start Date:
June 6, 2012
End Date:
August 3, 2012
Architect/Consultant:
MEP Engineering, Inc.
Mechanical, Electrical, & Plumbing Engineering
General Contractor:
Big State Electric Company
Project Summary:
Bid Award Agenda Item (PDF)
Bid Tab (PDF)


1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.