2007 Bond Project: Larkspur Elementary School
Classroom Addition


Project Completed
Project Details
Scope:
23 Classrooms and Gym Replacement with HVAC. The design provides for construction of: (1) twenty-one general instructional classrooms with integrated restrooms, (2) two pull-out classrooms supporting the music program, (3) new gym(+) with PE support facilities, (4) teacher support areas including three grade level workrooms, three book storage room and two conference rooms, (5) new parent-drop off/pick-up loop and campus parking expansion. The total facility program equals 44,975 square feet.
Planning Estimate 1:
$ 11,725,000
Start Date:
March 30, 2009
End Date:
August 6, 2010
Photo Gallery:
Aerial Photos
Construction Photos
Architectural Photos - April 2011
Architect:
O'Connell Robertson
O'Connell Robertson
General Contractor:
Bartlett Cocke General Contractors
Bartlett Cocke, Inc.
Project Summary:
Property Map (PDF)
Bid Award Agenda Item (PDF)
Bid Tab (PDF)
Project Summary (PDF)
Architectural Renderings (PDF)
Site Plan (PDF)
Floor Plans (PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.