2007 Bond Project: Larkspur Elementary School
Classroom Addition
Scope: |
23 Classrooms and Gym Replacement with HVAC. The design provides for construction of: (1) twenty-one general instructional classrooms with integrated restrooms, (2) two pull-out classrooms supporting the music program, (3) new gym(+) with PE support facilities, (4) teacher support areas including three grade level workrooms, three book storage room and two conference rooms, (5) new parent-drop off/pick-up loop and campus parking expansion. The total facility program equals 44,975 square feet. |
Planning Estimate 1: |
$ 11,725,000 |
Start Date: |
March 30, 2009 |
End Date: |
August 6, 2010 |
Photo Gallery: |
Aerial Photos Construction Photos Architectural Photos - April 2011 |
Architect: |
O'Connell Robertson![]() |
General Contractor: |
Bartlett Cocke General Contractors |
Project Summary: |
Property Map (PDF) Bid Award Agenda Item (PDF) Bid Tab (PDF) Project Summary (PDF) Architectural Renderings (PDF) Site Plan (PDF) Floor Plans (PDF) |
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.