2007 Bond Project: Garner Middle School
Fine Arts Addition and Auditorium Renovation


Project Completed
Project Details
Scope:
This project provides for both new construction and renovation elements, including: (1) construction of a new Fine Arts facility to replace the existing choir room (original construction – 1961) and orchestra portable classroom building, (2) renovation of the auditorium and stage areas, (3) construction of a new competition gymnasium (replacing the existing auxiliary gymnasium), (4) construction of a compliment of locker room and office areas to support the new gymnasium area, (5) installation of HVAC systems in the existing locker room areas, and (6) installation of related civil site infrastructure to support the programmed construction.
Planning Estimate 1:
$ 7,745,000
Start Date:
December 15, 2008
End Date:
July 30, 2010
Photo Gallery:
Aerial Photos
Construction Photos
Architectural Photos - April 2011
Architect:
McChesney/Bianco Architecture
McChesney/Bianco Architecture
General Contractor:
Joeris General Contractors, Ltd.
Joeris General Contractors, Ltd.
Project Summary:
Property Map
Bid Award Agenda Item
Bid Tab
Project Summary
Architectural Renderings
Site Plan
Floor Plans

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.