2007 Bond Project: Garner Middle School
Fine Arts Addition and Auditorium Renovation
Scope: |
This project provides for both new construction and renovation elements, including: (1) construction of a new Fine Arts facility to replace the existing choir room (original construction – 1961) and orchestra portable classroom building, (2) renovation of the auditorium and stage areas, (3) construction of a new competition gymnasium (replacing the existing auxiliary gymnasium), (4) construction of a compliment of locker room and office areas to support the new gymnasium area, (5) installation of HVAC systems in the existing locker room areas, and (6) installation of related civil site infrastructure to support the programmed construction. |
Planning Estimate 1: |
$ 7,745,000 |
Start Date: |
December 15, 2008 |
End Date: |
July 30, 2010 |
Photo Gallery: |
Aerial Photos Construction Photos Architectural Photos - April 2011 |
Architect: |
McChesney/Bianco Architecture |
General Contractor: |
Joeris General Contractors, Ltd. |
Project Summary: |
Property Map Bid Award Agenda Item Bid Tab Project Summary Architectural Renderings Site Plan Floor Plans |
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.