2007 Bond Project:
East Terrell Hills ES
Classroom Additions
Scope: |
New classroom and P.E. facility addition at East Terrell Hills Elementary School replacing twenty-two portable classrooms with permanent facilities and the existing metal gym with a new masonry gym facility. The design provides for construction of: (1) twenty-two general instructional classrooms with integrated restrooms, (2) two pull-out classrooms including a music classroom and computer lab, (3) gym (+) with PE support facilities, (4) teacher support areas, (5) administrative office area, (6) clinic, (7) career and counseling offices and (8) new parent drop-off/pick-up loop, fire lane extension and campus parking expansion. The total facility program equals 46,175 square feet. |
Planning Estimate 1: |
$ 11,825,000 |
Start Date: |
March 30, 2009 |
End Date: |
August 20, 2010 |
Photo Gallery: |
Aerial Photos | Construction Photos |
Architect: |
DeMunbrun Scarnato Associates, Inc. |
General Contractor: |
Joeris General Contractors, Ltd. |
Project Summary: |
Property Map (PDF) Bid Award Agenda Item (PDF) Bid Tab (PDF) Project Summary (PDF) Architectural Renderings (PDF) Site Plan (PDF) Floor Plans (PDF) |
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.