information for the community

2007 Bond Project: Churchill High School
Fine Arts Addition/Renovation


Project Completed
Project Details
Scope:
Fine Arts Addition and Renovation: Construct new Scene Production Studio (To be located adjacent to and back off Stage Area), Construct new Prop Storage Area (To be located adjacent to Scene Production Studio), Relocate Existing Drama Classroom to better facilitate overall design layout for Building Addition, Provide a Theater Arts Storage Library, and Renovate existing Boys and Girls Dressing Room / Storage Areas
Planning Estimate 1:
$ 1,125,000
Start Date:
April 2010
End Date:
November 2010
Photo Gallery:
Aerial Photos
Architect:
Garza Bomberger & Associates
Garza Bomberger and Associates
General Contractor:
Bartlett Cocke General Contractors
Bartlett Cocke, Inc.
Project Summary:
Property Map (PDF)
Bid Award Agenda Item (PDF)
Bid Tab (PDF)
Project Summary (PDF)
Architectural Renderings (PDF)
Site Plan (PDF)
Floor Plans (PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.