Legacy of Educational Excellence (LEE) Construction Projects
Legacy of Educational Excellence (LEE) High School / ISA Bond Projects

1400 Jackson-Keller
San Antonio, TX 78213
Map / Directions
Aerial / Architectural Photos
2015 Bond
LEE HS CTE and STEM Renovations


- Schematic Design Approval (PDF)
- Board of Trustees Schematic Design Presentation - September 12, 2016 (PDF - 6 MB)
- Bid Authorization (PDF)
- Bid Award and Bid Tab (PDF)
LEE HS New Fine Arts Center and Campus Renovations



- Schematic Design Approval
- Board of Trustees Schematic Design Presentation - October 10, 2016 (9 MB)
- Construction Manager at Risk Bid Award | Bid Tab (December 12, 2016)
- Bid Authorization (February 12, 2018)
- Bid Award | Construction Cost Bid Summary | Subcontractor Bid Summary | Value Engineering Summary (April 9, 2018)
- Kick-Off Conference (April 18, 2018) - Presentation (16 MB), Sign-In Sheet
- Performing Arts Center Video - January 14, 2021
LEE HS Roofing Maintenance
Phase 1

- Construction Document and Bid Delivery Method Approval
- Schematic Design Approval
- Bid Award | Bid Tab
Phase 2

- Bid Authorization Approval
- Bid Award | Bid Tab
- Bid Award | Bid Tab (Revised to Include Bid Alternate #1)
LEE HS Parking Lot Expansion
- Construction Document & Bid Delivery Method Approval (PDF)
- Bid Award (PDF) | Bid Tab (PDF)
LEE HS - Upgrade Football Field to Artificial Turf
LEE HS Central Plant Chiller Replacement
- Construction Document & Bid Delivery Method Approval (PDF)
- Bid Award (PDF) | Bid Tab (PDF)
Lee HS Fire Alarm Upgrades
Lee HS Keyless Access Control Upgrade
LEE HS Sports Fields Campus Facilities Safety and Security Upgrades Project (Perimeter Fencing, Gates and Access Control)
2011 Bond
LEE HS Facility Additions/Upgrades
- (Old Library Renovations Project)
- New JROTC Facility
- Science and Classroom Addition, Building 100 Renovations, Athletic Facility Addition, Tennis Courts Replacement, Athletic Field Concession Stand and Restroom Facility, Auditorium Lobby Addition, and Selective Building Demolitions
- January 2017 A4LE Meeting Presentation
- Construction-Manager-at-Risk Campus Improvement Project Bid Package III Facility Additions and Renovations Bid Award Presentation
- Construction-Manager-at-Risk Campus Improvement Project Bid Package III Facility Additions and Renovations Construction Document Approval
- New JROTC Facility Bid Package II Bid Award | Attachment #1 | Subcontractor Bid Summary | Project Value Engineering Summary
- New JROTC Facility Construction Document Approval-Bid Package II
- Lee High School Facility Additions and Renovations Project Schematic Design Approval | Presentation
- Construction Manager at Risk Bid Delivery Method Approval
- Construction Manager at Risk Selection Bid Award | Bid Tab
- Program and Concept Review Presentation
2010 QSC Bond
LEE HS Old Library Renovation
- Bid Award Agenda Item (PDF)
- Bid Tab (PDF)
2007 Bond
LEE HS Athletic Facility (Main and Auxiliary Gyms) Renovation and Lobby Expansion
LEE HS Basse-McCullough Sports Fields Lighting and Bleacher Seating Expansion
LEE HS Roof Replacement and Roof Related Work
- Construction Document Presentation (PDF)
- Bid Award (PDF)
- Bid Tab (PDF)
LEE HS JROTC Facility
Questions have arisen concerning replacement of the Lee High School JROTC Facility. This project was not included in either the 2003 or 2007 Bond Programs as developed, presented and approved by the voters of the North East Independent School District. However, because of the identified need to replace this aging facility, the Lee High School JROTC Replacement project was considered for possible inclusion in both the 2003 and 2007 Bond Programs using Bond Interest Earned funds to complete the replacement project. In the case of both the 2003 and 2007 Bond Programs, insufficient Bond Interest Earned funds were ultimately available to move forward with this project.
For the 2011 Bond Proposal, as adopted by the Board of Trustees in August 2011, the Lee High School JROTC Facility was formally and specifically included in the project improvements planned for the Lee High School campus, and was constructed as part of the 2011 Bond Program.
2003 Bond
LEE HS Classroom Addition
Questions have arisen concerning replacement of the Lee High School JROTC Facility. This project was not included in either the 2003 or 2007 Bond Programs as developed, presented and approved by the voters of the North East Independent School District. However, because of the identified need to replace this aging facility, the Lee High School JROTC Replacement project was considered for possible inclusion in both the 2003 and 2007 Bond Programs using Bond Interest Earned funds to complete the replacement project. In the case of both the 2003 and 2007 Bond Programs, insufficient Bond Interest Earned funds were ultimately available to move forward with this project.
For the 2011 Bond Proposal, as adopted by the Board of Trustees in August 2011, the Lee High School JROTC Facility was formally and specifically included in the project improvements planned for the Lee High School campus, and was constructed as part of the 2011 Bond Program.