District Calendar
This Week's Menus
Staff Directory
NEISD School Sub Column 2nd Level
layout-sub-column-2nd-level
skip to main content
North East Independent School District
Tennis Center at Blossom Athletic Center, San Antonio, Texas
North East ISD Tennis Center
at Blossom Athletic Center
12002 Jones Maltsberger Rd
San Antonio, TX 78216
Map / Directions
Aerial/Construction Photos

2015 Bond

NEISD BAC Tennis Center Courts Expansion and Facility Upgrades Project

The 2015 Bond Program included funding at the BAC Tennis Center to provide selected facility improvements. The 2015 Bond provided for construction of the following program elements: (1) construct four new tennis courts to bring the facility total to eighteen courts; (2) resurface twelve of the existing fourteen tennis courts and add a petro-mat underlayment to help minimize surface cracking; (3) upgrade the existing tennis center facility courts lighting system to improve night-play lighting levels; (4) construct new facility entrance canopy; and (5) construct various site infrastructure improvements (landscape, irrigation, drainage, site utilities, and hardscape) to support the overall project.

Planning Estimate1: $4,500,000

Start Date: October 2017

End Date: April 2018

Architect: RVK ArchitectsRVK Architects - San Antonio

General Contractor: Marksmen General Contractors

Pictures: Aerial/Architectural

Project Summary:

 Tennis Courts Concrete Pour
Concrete Pour - 2015 Bond Blossom Athletic Center Tennis Courts (April 2018)
 
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.

2010 QSC Bond

NEISD BAC Tennis Center Upgrades Project

The 2010 project included the following: Recoat 12 tennis courts; replace 2 asphalt courts with concrete due to soil conditions and provide lighting for the courts; resurface and recoat practice court; add perimeter fencing for security and crowd control; and add new windscreens.

Planning Estimate1: $452,925 (Funded from the Maintenance & Operations Program)

Start Date: May 2010

End Date: August 2010

Architect: RVK ArchitectsRVK Architects - San Antonio

General Contractor: Premier Courts

Pictures: Aerial/Architectural

 
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.

>>>Previous NEISD BAC Tennis Center Construction Bond Projects<<<

SAN ANTONIO WEATHER