Garner Middle School Bond Projects

Garner Middle School, North East ISD, (NEISD) San Antonio, Texas
Garner Middle School
4302 Harry Wurzbach
San Antonio, TX 78209
Map / Directions
Aerial/Construction Photos

2015 Bond

Garner MS Campus Replacement Plan Phase IV

Garner Middle School celebrates new facilities with ribbon cutting
9/23/2019 - Parents, students, teachers and District administrators celebrated with an official ribbon cutting.
 
The 2015 Bond Program included funding to continue implementation of the Garner Middle School Master Redevelopment Project and provide new modernized facilities for the campus. Previous bond programs have funded a new Science Classroom Addition (2003 Bond), a new Athletic Facility Addition (2007 Bond), and a new two-story Classroom Addition which houses the 6th, 7th, and 8th grade classrooms (2011 Bond). The 2015 Bond continued the campus redevelopment plan and provided for construction of the following program elements: (1) kitchen and cafeteria with performance stage area; (2) fine arts facilities including band, orchestra, choir, and black box program areas; (3) library and media center; and (4) landscaping, irrigation, drainage, site utilities, and infrastructure improvements to complement the new facility addition. The project included approximately 52,002 square feet of new facilities and 6,723 square feet of selected renovations of existing classroom areas into temporary facilities to support the library, special education, and career and technology program areas.
Planning Estimate1: $18,500,000
Start Date: May 2017
End Date: September 2019
Project Summary: (PDF Format)

Garner MS Secure Entry Vestibule

Learn more about the #1.2 District Secure Entry Vestibule Additions and Renovations Project (19 Campuses) at 2015 Specialty Bond Projects.

Garner MS Upgrade Athletic Track

Learn more about the #3.4 Upgrade Middle School Athletic Tracks to All-Weather Surface Systems Project at 2015 Specialty Bond Projects.

Garner MS Keyless Access Control and Video Surveillance Camera Upgrades

Learn more about the Campus Keyless Access Control and Video Surveillance Camera Upgrades Project (69 Campuses) at 2015 Specialty Bond Projects.

2011 Bond

Garner MS Campus Replacement Phase III

The Garner Middle School Campus Replacement Phase III design provided for construction of: (1) three complete grade-level houses including: forty-two grade-level classrooms; three resource classrooms; three collaborative learning centers; and three teacher resource centers; (2) journalism classroom; (3) central plant facility; (4) fire lane extension; (5) parking lot expansion; (6) landscaping, irrigation, drainage, site utilities, and infrastructure improvements to complement the new classroom addition; (7) four tennis courts and two outdoor basketball courts; (8) covered walkway connecting the new classroom addition to the existing campus facilities; and (9) channel improvements to the adjacent Salado Creek area. The total facility program equals 90,500 sq. ft. for the new classroom facility addition. Bid Package I constructed site infrastructure & utilities and FEMA-required drainage channel improvements for the adjacent Salado Creek floodway channel in preparation for the follow-on Bid Package II Classroom Addition/Renovation Project.
Planning Estimate1: $25,000,000
Start Date: March 2015
End Date: March 2017
Project Summary (PDFs):

2007 Bond

Garner MS Fine Arts Addition and Auditorium Renovation - Phase II

The 2007 Bond Program included funding for both new construction and renovation elements at Garner Middle School, including: (1) construction of a new Fine Arts facility to replace the existing choir room (original construction – 1961) and orchestra portable classroom building, (2) renovation of the auditorium and stage areas, (3) construction of a new competition gymnasium (replacing the existing auxiliary gymnasium), (4) construction of a compliment of locker room and office areas to support the new gymnasium area, (5) installation of HVAC systems in the existing locker room areas, and (6) installation of related civil site infrastructure to support the programmed construction.
Planning Estimate1: $7,745,000
Start Date: December 15, 2008
End Date: July 30, 2010
Project Summary:(PDF Format)

2003 Bond

Garner MS Science Addition and Admin Area HVAC Renovations - Phase I

The 2003 Bond Program included funding for a Science Lab Facility: 8 Science Labs, 1 Centralized Chemical Storage Area, 3 Preparatory Storage Areas (1 adjacent to each Grade-Level), 2 Faculty Restrooms Upgraded, Science Department Offices (1 Office, 1 Workroom), Safety Equipment integrated in Labs and Prep Areas, Connect New One-Story Prototype Facility to existing Facilities through a Covered Walkway.
Planning Estimate1: $4,472,760
Start Date: May 2007
End Date: November 2008
Project Summary: (PDF Format)

>>>Previous Garner Middle School Bond Projects<<<

Additional Information

9/23/2019 - Garner Middle School celebrated new facilities with ribbon cutting

Garner Middle School celebrates new facilities with ribbon cutting
 
9/23/2019 - Parents, students, teachers and District administrators celebrated with an official ribbon cutting.
 
Garner Middle School first opened its doors to students in North East ISD in 1961. Garner has evolved with its students and community over the years, and a new library, cafeteria and fine arts wing is the next step in enhancing the overall education experience on campus.
 
Teacher Cathryne Efron has been at Garner for the past ten years, so she’s watched much of the campus transform in front of her eyes. She says it’s so much more than a new building, it’s a source of pride for the teachers, faculty and students.
 
“It’s so rewarding for the teachers and students to walk into a building that has top-of-the-line furniture and equipment for us to use every day,” said Efron. “You can see the immediate pride on the faces of the students when they walk into these buildings and they realize that it’s all for them."
 
The District’s 2015 bond program funded several new additions at Garner, including a new kitchen and cafeteria with a performance stage, library and media center, and fine arts facility to house band, orchestra, choir and theater students.
While Garner may be changing with the times, its core mission remains the same. Every administrator, teacher and staff member on campus is there to provide the highest quality education to its students. The new facilities and technology only enhance that.
 
“It gives them something to be proud of," said Efron. "It gives us all something to be proud of.”
Parents, students, teachers and District administrators celebrated on Monday, September 23, 2019, with an official ribbon cutting and a tour of the new additions.