Transportation Central Bus Facility Construction Projects

San Antonio, TX
2015 Bond
Transportation Central Bus Terminal Facility Upgrades
The 2015 Bond Program includes funding to provide facility upgrades for the North East ISD Transportation Central Bus Terminal. The 2015 Bond will provide the following program elements: (1) Transportation foreman and coordinator’s office renovations (4,217 sq. ft.); (2) renovate interior shop bay areas, including: LED lighting retrofit, large ceiling fan installation, pull-down reels for distribution/use of service lubricants and compressed air, interior painting, work bench replacement, intercom system installation, storage area upgrades, and reseal concrete shop bay floors (20,210 sq. ft.); (3) renovate exterior shop bay areas by adding a canopy extension to the existing facility, constructing new heavy-duty driveway approaches, and install new high-pressure wash system (29,800 sq. ft.); and (4) upgrade transportation fueling station equipment. The total facility program for this project equals 54,227 sq. ft.
Planning Estimate1: $1,000,000
Start Date: September 2018
End Date: July 2019
Architect: Lopez Salas Architects, Inc.
General Contractor: Satterfield & Pontikes Construction
Project Summary: (PDF format)
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.
2007 Bond
Transportation Central Bus Wash
The 2007 Bond includes a Bus Wash Facility to provide an efficient and functional method to wash and maintain the district busses and small vehicle fleet in a clean and cost effective manner. The bus washing facility includes an automated energy efficient operation and water reclamation system.
Planning Estimate1: $550,000
Start Date: December 2009
End Date: July 2010
Architect: Pape-Dawson Engineers 
General Contractor: F.A. Nunnelly Company
Project Summary: (PDF Format)
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.