Wood Middle School Construction Projects

2015 Bond
Wood MS Secure Entry Vestibule
Wood MS Athletic Track Upgrade to All-Weather Surface System
Wood MS Cafetorium Stage Lighting and Equipment Upgrades Project
Wood MS Keyless Access Control Upgrades
2007 Bond
Wood MS New Athletic Facility
The 2007 Bond Program includes funding for the following:
- Add HVAC to Existing Competition Gym and Locker Room Areas
- Add Large Ceiling Mounted Fans for Air Distribution
- Replace Existing Metal Gym with New Masonry Gym Facility (Revised)
- Add Multi-Purpose Classroom to Replace Lost Shop Area (New)
- Provide Office Area for Coaches and Gym Storage (New)
- Add Weight Room adjacent to New Competition Gym (New)
- Add Parking adjacent to New Athletic Facility (New)
Planning Estimate1: $5,002,453
Start Date: June 7, 2010
End Date: July 31, 2011
Architect: Silber & Associates
General Contractor: Joeris General Contractors, Ltd.
Pictures: Aerial/Architectural
Project Summary: (PDF Format)
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.
Wood MS HVAC Upgrades for P.E./Athletic/Fine Arts Extracurricular Facilities
2003 Bond
Wood MS Science Addition
The 2003 Bond Program included funding for a new Science Lab Facility with 8 Science Labs, 1 Centralized Chemical Storage Area, 3 Preparatory Storage Areas (1 adjacent to each Grade-Level), 2 Faculty Restrooms Upgraded, Science Department Offices (1 Office, 1 Workroom), Safety Equipment integrated in Labs and Prep Areas, Connect New One-Story Prototype Facility to existing Facilities through a Covered Walkway.
Planning Estimate1: $4,896,122
Start Date: March 2004
End Date: August 2005
Architect: Garza Bomberger & Associates
Architect: O'Neill Conrad Oppelt Architects Inc. (OCO)
General Contractor: Bartlett Cocke General Contractors, Inc.
Pictures: Aerial/Architectural
Project Summary: (PDF Format)
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.
Wood MS Roofing Program
Phase 1
The 2003 Bond Program included funding to upgrade and/or maintain existing roofs to a uniform district standard. Phase I of this roofing project replaced the roof installed in 1981 at the Wood Middle School main academic building 2nd floor over an area measuring approximately 29,081 sq. ft.
Planning Estimate1: $494,377
Start Date: December 2004
End Date: April 2005
Architect: Edis Oliver and Associates, Inc.
General Contractor: Samuel Dean Sheetmetal
Pictures: Aerial
Project Summary:
- Bid Award Agenda Item (PDF)
- Bid Tab (PDF)
Phase 2
The remaining roof areas not replaced in Phase I, measuring approximately 66,129 sq. ft., were replaced during Phase II of this project during the summer of 2005.
Planning Estimate1: $1,159,141
Start Date: June 2005
End Date: September 2005
Architect: Wiss, Janney, Elstner Associates, Inc.
General Contractor: Port Enterprises Ltd.
Pictures: Aerial
Project Summary:
- Bid Award Agenda Item (PDF)
- Bid Tab (PDF)
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.