Krueger Middle School Bond Projects

Krueger Middle School, North East ISD, San Antonio, Texas
Krueger Middle School
438 Lanark Drive
San Antonio, TX 78218
Map / Directions
Aerial/Architectural Photos

2015 Bond

Krueger MS Campus Replacement Plan Phase II

Krueger Middle School Campus Replacement Plan Phase II Perspective
The 2015 Bond Program included funding to continue implementation of the Krueger Middle School Campus Replacement Master Plan and provide new modernized facilities for the campus. The 2015 Bond provided for construction of the following program elements: (1) new cafeteria and kitchen area; (2) new fine arts area (band, orchestra, choir, and theater arts); (3) new athletic facility with two gymnasiums, locker rooms, coaches offices, laundry room, and storage; (4) new central plant with air-cooled chillers, boilers, and associated pumps; (5) four new tennis courts; (6) field house with public restrooms and athletic storage area; (7) new football bleacher seating; (8) new parking areas; and (9) site infrastructure improvements (landscaping, irrigation, drainage, site utilities, and hardscape) to complement the new facility addition. The design program for the 2015 Bond Krueger Middle School Phase 2 Campus Replacement Project equals 82,631 sq. ft. of new facility improvements. Phase 1 work at the campus included construction of a new Science Facility as part of the 2003 Bond Program.
Planning Estimate1: $24,750,000
Start Date: February 2018
End Date: August 2020
Architect: LPA, Inc.LPA, Inc. - San Antonio
Project Summary (PDF Format):

Krueger MS Secure Entry Vestibule Additions and Renovations Project

Learn more about the #1.2 District Secure Entry Vestibule Additions and Renovations Project (19 Campuses) at 2015 Specialty Bond Projects.

Krueger MS Special Education Restroom Renovations

Learn more about the #5.11 Special Education Restroom Renovations Project (14 Campuses) at 2015 Specialty Bond Projects.

Krueger MS Fire Alarm Upgrades

Learn more about the District Operations Facility Maintenance Upgrades and Improvements (DDC Controls and Fire Alarm Systems) Project at 2015 Specialty Bond Projects.

Krueger MS Keyless Access Control and Video Surveillance Camera Upgrades

Learn more about the Campus Keyless Access Control and Video Surveillance Camera Upgrades Project (69 Campuses) at 2015 Specialty Bond Projects.

Krueger MS Intercom and Clock Systems Upgrade

Learn more about the Campus Intercom and Clock Systems Upgrades Project at 2015 Specialty Bond Projects.

Krueger MS Middle School Athletic Tracks Upgrade to All-Weather Surface Systems

Learn more about the #3.4 Middle School Athletic Tracks Upgrade to All-Weather Surface Systems at 2015 Specialty Bond Projects.

2010 QSC Bond

Krueger MS Exterior Curtain Wall and Upgrades

The 2010 Qualified School Construction Bond Program includes funding to replace the exterior curtain wall system at the Krueger Middle School Auditorium. This wall system no longer provides a weather-resistant barrier, as a result of continued exposure to the elements and system age. The project will: (1) replace the existing brick veneer, inset windows, and spandrel panels with a new curtain wall system and stucco veneer exterior finish; (2) install new exterior doors and windows; (3) provide fabric-wrapped acoustical panels on the interior wall surface; and (4) paint the auditorium interior walls.
Planning Estimate1: $285,000
Start Date: June 2013
End Date: August 2013
General Contractor: Baron-Long Construction, Ltd.
Project Summary:

2007 Bond

Krueger MS Roofing Program

The 2007 Bond Program included funding for Roofing Improvements to Upgrade and/or Maintain the Existing Roof to a Uniform District Standard.
Planning Estimate1: $273,160
Pictures: Aerial

Krueger MS HVAC Upgrades for P.E./Athletic/Fine Arts Facilities

Learn more about the HVAC Upgrades for P.E./Athletic/Fine Arts Middle School and High School Facilities at 2007 Specialty Bond Projects.

2003 Bond

Krueger MS Science Addition

The 2003 Bond Program included funding for a Science Lab Facility: 8 Science Labs, 1 Centralized Chemical Storage Area, 3 Preparatory Storage Areas (1 adjacent to each Grade-Level), 2 Faculty Restrooms Upgraded, Science Department Offices (1 Office, 1 Workroom), Safety Equipment integrated in Labs and Prep Areas, Connect New One-Story Prototype Facility to existing Facilities through a Covered Walkway.
Planning Estimate1: $4,310,742
Start Date: May 2005
End Date: November 2006
Pictures: Aerial
Project Summary: