Eisenhower Middle School Bond Projects

Eisenhower Middle School, North East ISD, (NEISD) San Antonio, Texas
Eisenhower Middle School
8231 Blanco Road
San Antonio, TX 78216
Map / Directions
Aerial/Construction Photos

2015 Bond

Eisenhower MS Cafeteria Expansion and Library Upgrades

The 2015 Bond Program includes funding to convert the old locker room facilities into a new campus library and renovate the old competition gymnasium into a new cafeteria dining and a breezeway for convenient access to the new campus parking lot and bus loop. The project includes approximately 13,300 square feet of renovated facilities into new programmed areas.
Planning Estimate1: $2,500,000
Start Date: July 1, 2016
End Date: December 19, 2016
Architect: Marmon MokMarmon Mok - San Antonio
General Contractor:Marksmen General ContractorsMarksmen General Contractors - San Antonio
Project Summary:

Eisenhower MS Secure Entry Vestibule Additions and Renovations

Learn more about the #1.2 District Secure Entry Vestibule Additions and Renovations Project (19 Campuses) at 2015 Specialty Bond Projects.

Eisenhower MS Special Education Restroom Renovations

Learn more about the #5.11 Special Education Restroom Renovations Project at 2015 Specialty Bond Projects.

Eisenhower MS Kitchen Facility HVAC Upgrades

Learn more about the District Facility Operations MEP Upgrades Bid Package 1C at 2015 Specialty Bond Projects.

Eisenhower MS Keyless Access Control and Video Surveillance Camera Upgrades

Learn more about the Campus Keyless Access Control and Video Surveillance Camera Upgrades Project (69 Campuses) at 2015 Specialty Bond Projects.

Eisenhower MS Middle School Athletic Tracks Upgrade to All-Weather Surface Systems

Learn more about the #3.4 Middle School Athletic Tracks Upgrade to All-Weather Surface Systems at 2015 Specialty Bond Projects.

2011 Bond

Eisenhower MS Classroom Addition

The 2011 Bond provided for construction of: (1) a classroom addition which includes fourteen classrooms, one resource classroom, collaborative learning center, and teacher resource areas; (2) an athletic addition which includes a new competition gymnasium, weight room, boys' & girls' athletic/P.E. locker rooms and storage areas, men and women coaches' office areas, laundry room, lobby, public restrooms, and concession stand; (3) expansion of the campus central energy plant capacity to support the new program areas; (4) fire lane extension; (5) campus parking lot expansion; (6) site utilities, drainage, hardscape, and landscaping/irrigation systems; (7) two new tennis courts and outdoor basketball court; and (8) an athletic field storage and restroom facility. Additionally, the project will include two bid alternates: (1) renovation of the existing competition gymnasium into additional cafeteria dining area and an outdoor covered breezeway; and (2) renovation of the existing campus locker room areas into a new library and computer lab. Bid Package I  installed new site utilities infrastructure and procure new air-cooled chillers to support the follow-on Bid Package II construction work. The total facility program equaled 55,000 sq. ft. for the new classroom and athletic facility additions.
Planning Estimate1: $18,750,000
Start Date: June 2014
End Date: March 2016
Project Summary (PDF Format):

2007 Bond

Eisenhower MS Auditorium Renovation and Campus-Wide Restroom Renovations

The design provides for renovations in the auditorium including: (1) seating upgrade, (2) wall treatment and acoustical upgrades, (3) flooring replacement, (4) curtain upgrade package, (5) sound system replacement, and (6) ceiling and lighting upgrades. Additionally, all campus restrooms will be renovated to include: (1) fixture replacement, (2) flooring replacement, (3) wall finish upgrades, (4) lighting replacement, (5) toilet partition replacement and (6) interior painting.
Planning Estimate1: $2,750,000
Start Date: June 2009
End Date: December 2009
General Contractor: Alpha Building Corporation
Project Summary:

Eisenhower MS HVAC Upgrades

Learn more about the Middle and High School HVAC Upgrades for P.E./Athletic/Fine Arts Extracurricular Facilities at 2007 Specialty Bond Projects.

2003 Bond

Eisenhower MS Science Additions

The 2003 Bond Program includes a Science Lab Facility: 8 Science Labs, 1 Centralized Chemical Storage Area, 3 Preparatory Storage Areas (1 adjacent to each Grade-Level), 2 Faculty Restrooms Upgraded, Science Department Offices (1 Office, 1 Workroom), Safety Equipment integrated in Labs and Prep Areas, Connect New One-Story Prototype Facility to existing Facilities through a Covered Walkway.
Planning Estimate1: $5,556,848
Start Date: January 2006
End Date: July 2007
Project Summary: (PDF Format)