District Calendar
This Week's Menus
Staff Directory
NEISD School Sub Column 2nd Level
layout-sub-column-2nd-level
skip to main content
North East Independent School District
White Middle School, North East ISD, (NEISD) San Antonio, Texas
Ed White Middle School
7800 Midcrown
San Antonio, TX 78218
Map / Directions
Aerial/Construction Photos

2015 Bond

White MS Cafetorium Stage Lighting and Equipment Upgrades Project

Learn more about the Middle School Cafetorium Stage Lighting and Equipment Upgrades Project (3 Campuses) at 2015 Specialty Bond Projects.

White MS Secure Entry Vestibule Additions and Renovations Project

Learn more about the #1.2 District Secure Entry Vestibule Additions and Renovations Project (19 Campuses) at 2015 Specialty Bond Projects.

White MS Special Education Restroom Renovations

Learn more about the Special Education Restroom Renovations Project at 2015 Specialty Bond Projects.

White MS Middle School Athletic Track Upgrade to All-Weather Surface System

Learn more about the #3.4 Middle School Athletic Tracks Upgrade to All-Weather Surface Systems at 2015 Specialty Bond Projects.

White MS Keyless Access Control and Video Surveillance Camera Upgrades

Learn more about the Campus Keyless Access Control and Video Surveillance Camera Upgrades Project (69 Campuses) at 2015 Specialty Bond Projects.

2011 Bond

White MS Athletic Facility Addition and Renovation

The 2011 Bond Program Included funding to build new athletic support facilities at White Middle School and reuse either the existing competition gym or auxiliary gym within the design concept. The design provided for construction of the following: (1) new competition gymnasium; (2) boys' and girls' athletic and P.E. locker room and storage areas; (3) men and women coaches' office areas; (4) weight room; (5) laundry room; (6) lobby, public restrooms, and concession stand; (7) fire lane extension; (8) parking lot expansion; (9) landscaping, irrigation, drainage, site utilities, and infrastructure improvements to complement the new athletic facility addition; (10) two outdoor basketball courts; and (11) an outdoor athletic storage and restroom facility. Additionally, designed as a bid alternate, the existing locker room areas will be renovated into eight classrooms to replace the existing eight portable classrooms at the campus. The total campus facility program equals 33,547 sq. ft. with 26,867 sq. ft. designated for the new athletic facility addition/renovation and 6,680 sq. ft. for the locker room renovation and conversion into classrooms.

Planning Estimate1: $10,400,000

Start Date: May 2014

End Date: February 2016

Architect: Pfluger Associates Architects

General Contractor: Bartlett Cocke General Contractors, Inc.

Pictures: Aerial/Architectural

Project Summary: (PDF Format)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.

2007 Bond

White MS Fine Arts Addition (Orchestra and Band Hall Program)

The 2007 Bond Program included funding to construct a new band hall (6,575 gross sq.ft.) and renovate the existing band hall into an orchestra program area (2,150 gross sq.ft.).

Planning Estimate1: $1,275,000

Start Date: June 9, 2008

End Date: December 29, 2010

Architect:O'Neill Conrad Oppelt Architects Inc. (OCO)

General Contractor: Satterfield & Pontikes

Pictures: Aerial

Project Summary: (PDF Format)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.

White MS Roofing Program

The 2007 Bond Program includes funding for Phase I - Replace the second floor roofs of the main building at White Middle School measuring approximately 40,700 sq. ft. Phase II - Includes a roof replacement area of 32,198 sq. ft.

Planning Estimate1: $2,185,550

Start Date: June 7, 2010

End Date: August 26, 2010

Architect: Wiss, Janney, Elstner Associates, Inc.

General Contractor: Phase 1: Port Enterprises Phase 2: Port Enterprises

Pictures: Aerial

Project Summary: (PDF Format)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.

White MS HVAC Upgrades for P.E./Athletic/Fine Arts Facilities

Learn more about the HVAC Upgrades for P.E./Athletic/Fine Arts Middle School and High School Facilities at 2007 Specialty Bond Projects.

2003 Bond

White MS Science and Clinic Addition/Renovations

The 2003 Bond Program included funding for a Nurse's Clinic Expansion/Renovation and a New Science Lab Facility including 8 Science Labs, 1 Centralized Chemical Storage Area, 3 Preparatory Storage Areas (1 adjacent to each Grade-Level), 2 Faculty Restrooms Upgraded, Science Department Offices (1 Office, 1 Workroom), Safety Equipment integrated in Labs and Prep Areas, Connect New One-Story Prototype Facility to existing Facilities through a Covered Walkway.

Planning Estimate1: $4,731,887

Start Date: May 2005

End Date: November 2006

Architect: Garza Bomberger & Associates

Architect: O'Neill Conrad Oppelt Architects Inc. (OCO)

General Contractor: Bartlett Cocke General Contractors, Inc.

Pictures: Aerial

Project Summary: (PDF Format)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.

>>>Previous White Middle School Bond Projects<<<