Johnson High School Construction Projects
Johnson High School Bond Projects

23203 Bulverde Rd.
San Antonio, TX 78259
Map / Directions
Aerial/Construction Photos
2015 Bond
Johnson HS Band Hall Expansion

- Schematic Design Approval
- Board of Trustees Schematic Design Presentation - May 8, 2017 (4.5 MB)
- Bid Authorization - February 12, 2018
- Pre-Proposal Conference (March 9, 2018) Presentation (PDF - 10 MB), Sign-In Sheet | Kick-Off Conference (April 30, 2018) Presentation (PDF - 12 MB), Sign-In Sheet
- Bid Award | Bid Tab (April 9, 2018)
Johnson HS On-Site Detention Basin Project
The 2015 Bond Program included funding to replace the existing natural grass at the main football field with an artificial turf system. The Texas Commission on Environmental Quality (TCEQ) considers the artificial turf field to be an impervious surface which increases the campus' overall impervious cover beyond 20%. Exceeding this threshold triggered the requirement to construct on-site detention basins to mitigate the increase in impervious cover beyond the 20% threshold.
Planning Estimate1: $ 500,000
Start Date: August 1, 2016
End Date: December 2, 2016
Photo Gallery: N/A
Architect: Pape-Dawson Engineers
General Contractor: Clearfield Construction, LLC
Pictures: Aerial/Architectural
Project Summary:
- Construction Document and Bid Delivery Method Approval (PDF)
- Bid Award (PDF) | Bid Tab (PDF)
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.
Johnson HS Football Field Upgrade to Artificial Turf
Johnson HS JROTC Facility Air-Rifle Target and Scoring System Upgrades
Johnson HS Keyless Access Control Upgrades
2011 Bond
Johnson HS Athletic Field Outdoor Restrooms/Concessions
2003 Bond
Johnson HS - New School
Package A: Site Mass Grading & Preparation


Package B: Facilities / Athletic Fields / Site Infrastructure