Windcrest Elementary School Bond Projects

Windcrest Elementary School, North East ISD, (NEISD) San Antonio, Texas
Windcrest Elementary School
465 Faircrest
San Antonio, TX 78239
Map / Directions
Aerial/Construction Photos

2015 Bond

Windcrest ES Fire Alarm Upgrades

Learn more about the District Operations Facility Maintenance Upgrades and Improvements (DDC Controls and Fire Alarm Systems) Project at 2015 Specialty Bond Projects.

Windcrest ES New Paved Walking Track

Learn more about the #5.16 Elementary School Walking Tracks Project (37 Campuses) at 2015 Specialty Bond Projects.

Windcrest ES Keyless Access Control Upgrades

Learn more about the Campus Keyless Access Control and Video Surveillance Camera Upgrades Project (69 Campuses) at 2015 Specialty Bond Projects.

2011 Bond

Windcrest ES Classroom Addition

The 2011 Bond provided funding to construct a new building addition to replace twenty portable classrooms with permanent classroom facilities. The design included construction of: (1) twenty new classrooms with integrated restrooms, including nineteen general-purpose classrooms and one music classroom with an office and instrument storage area; (2) library and media center; (3) computer lab; (4) teacher resource and support areas; (5) covered walkways at the parent drop-off/pick-up area and bus loading/unloading area; (6) fire lane extension; (7) central plant for the new classroom/library addition; and (8) landscaping, irrigation, drainage, site utilities, and infrastructure improvements to complement the new facility addition. Building renovations to the existing campus include: (9) renovating the existing library area in a new administrative office area; (10) renovating the existing administrative office area into the career and counseling suite and clinic area; (11) renovating the existing clinic area into a new ALE Classroom and restroom area; and (12) enclosing the existing entry alcove and converting this space into an air-conditioned entry vestibule. The total facility program for the campus equals 52,770 sq. ft., with 43,740 sq. ft. for the new classroom/library addition and 9,030 sq. ft. for the campus renovations program.
Planning Estimate1: $14,750,000
Start Date: January 2014
End Date: August 2015
Architect: Alamo ArchitectsLogo for Alamo Architects
Project Summary: (PDF Format)
 
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.

2007 Bond

Windcrest ES Metal Gym Replacement with Masonry Gyms & HVAC

Learn more about the Elementary School Metal Gym Replacement with Masonry Gyms & HVAC Project at 2007 Specialty Bond Projects.

>>>Previous Windcrest Elementary School Construction Bond Projects<<<