2015 Bond
Walzem ES Secure Entry Vestibule
Learn more about the #1.2 District Secure Entry Vestibule Additions and Renovations Project (19 Campuses) at 2015 Specialty Bond Projects.
Walzem ES Kitchen HVAC Upgrades
Learn more about the District Facility Operations MEP Upgrades Bid Package 2A Project at 2015 Specialty Bond Projects.
Walzem ES Restroom Renovations
Learn more about the #5.12 District Restroom Renovations Project (5 Campuses) at 2015 Specialty Bond Projects.
Walzem ES New Paved Walking Track
Learn more about the #5.16 Elementary School Walking Tracks Project (37 Campuses) at 2015 Specialty Bond Projects.
Walzem ES Keyless Access Control and Video Surveillance Camera Upgrades
Learn more about the Campus Keyless Access Control and Video Surveillance Camera Upgrades Project (69 Campuses) at 2015 Specialty Bond Projects.
2007 Bond
Walzem ES Metal Gym Replacement with Masonry Gym & HVAC
Learn more about the Elementary School Metal Gym Replacement with Masonry Gyms & HVAC Project at 2007 Specialty Bond Projects.
2003 Bond
Walzem ES Classroom Addition
The 2003 Bond Program provided for the following: (1) twenty-eight general purpose classrooms (~ 725 net sq. ft.), (2) two music rooms with storage areas and an office, (3) restrooms adjoining each pair of general purpose classrooms per the standard elementary school prototype design, (4) supporting teacher resource areas consisting of a workroom, book storage area, faculty restrooms, and two resource rooms, (5) facility vestibule area and elevator, and (6) twenty additional parking spaces, and (7) fire lane extension through the rear area of the campus with a covered walkway for Parent Drop-off.
Planning Estimate1: $5,420,00
Start Date: April 2005
End Date: September 2006
Architect: Demunbrun-Scarnato Associates
General Contractor: Bartlett Cocke General Contractors, Inc.
Pictures: Aerial/Architectural
Project Summary: (PDF Format)
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.