Stahl Elementary School Construction Projects
Stahl Elementary School Bond Projects

Stahl Elementary School
5222 Stahl Road
San Antonio, TX 78247
Map / Directions
Aerial/Construction Photos
5222 Stahl Road
San Antonio, TX 78247
Map / Directions
Aerial/Construction Photos
2015 Bond
Stahl ES Secure Entry Vestibule
Learn more about the #1.2 District Secure Entry Vestibule Additions and Renovations Project (19 Campuses) at 2015 Specialty Bond Projects.
Stahl ES New Paved Walking Track
Learn more about the #5.16 Elementary School Walking Tracks Project (37 Campuses) at 2015 Specialty Bond Projects.
Stahl ES Roofing Maintenance
Typical roof life expectancies range from 20 to 30 years based upon several factors, which include: (1) quality of the roof product and construction installation; (2) wear and tear due to foot traffic for operations and maintenance access to rooftop equipment; and (3) long-term weather conditions and resultant impacts. This project addressed the Stahl Elementary School Re-Roofing and Roof-Related Work Project, which included a total roof replacement area of 90,135 sq. ft.
Planning Estimate1: $2,297,550
Architect: Wiss, Janney, Elstner Associates, Inc.
General Contractor: CS Advantage USAA Inc.
Pictures: Aerial
Project Summary:
- Schematic Design Approval (PDF)
- Bid Authorization Approval (PDF)
- Bid Award and Bid Tab (PDF)
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.
Stahl ES Parking Lot Lighting Upgrades
Learn more about the District Facility Operations MEP Upgrades Bid Package 2A Project at 2015 Specialty Bond Projects.
Stahl ES Keyless Access Control Upgrades
Learn more about the Campus Keyless Access Control and Video Surveillance Camera Upgrades Project (69 Campuses) at 2015 Specialty Bond Projects.
2007 Bond
Stahl ES Facilities HVAC Upgrades
Learn more about the Elementary School Facilities HVAC Upgrades Project at 2007 Specialty Bond Projects.
>>>Previous Stahl Elementary School Construction Bond Projects<<<
- 1998 Bond Stahl ES Summary (PDF)
- 1995 Bond Stahl ES Summary (PDF)