2015 Bond
Ridgeview ES Re-Roofing and Roof-Related Work Project
The 2015 Bond Program included funding to replace selected roofed areas at seven (7) District facilities as part of the District’s planned Roof Replacement Program. Facilities included in the 2015 Bond Roofing Construction Program include: Lee High School; Krueger Middle School (transferred to the hail damage claim); and Clear Spring, Northwood, Ridgeview, Serna, and Stahl Elementary Schools. Typical roof life expectancies range from 20 to 30 years based upon several factors, which include: (1) quality of the roof product and construction installation; (2) wear and tear due to foot traffic for operations and maintenance access to rooftop equipment; and (3) long-term weather conditions and resultant impacts. This project addressed the Ridgeview Elementary School Re-Roofing and Roof-Related Work Project, which includes a total roof replacement area of 8,040 sq. ft.
Planning Estimate1: $295,000
Architect: Wiss, Janney, Elstner Associates, Inc.
General Contractor: Turner Roofing
Pictures: Aerial
Project Summary: (PDF Format)
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.
Ridgeview ES Maintenance and Repair for Parking Lots and Drop-Off/Pick-Up Lanes
The 2015 Bond Program includes funding for maintenance and repair of parking lots and/or drop-off and pick-up lanes at two District campuses (Ridgeview and Serna Elementary Schools) as part of the District's 2015 Bond Asphalt Paving Maintenance and Repair Program. The District maintains approximately 15,500,000 square feet of paved asphalt parking surfaces. Asphalt parking surfaces require periodic maintenance and repair as a result of varying geological soil conditions underlying campus parking areas, surface wear and tear from vehicular traffic, and annual weather conditions. This project addresses the Ridgeview Elementary School Parking Lot Maintenance and Repair Project, which includes repairing damaged asphalt surfaces and seal coating/restriping the front parking lot measuring 30,366 square feet.
Planning Estimate1: $200,000
Architect: -
General Contractor: -
Project Summary:
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.
Ridgeview ES Restroom Renovations
Learn more about the #5.12 District Restroom Renovations Project (5 Campuses) at 2015 Specialty Bond Projects
Ridgeview ES New Paved Walking Track
Learn more about the #5.16 Elementary School Walking Tracks Project (37 Campuses) at 2015 Specialty Bond Projects.
Ridgeview ES Parking Lot Lighting Upgrades
Learn more about the District Facility Operations MEP Upgrades Bid Package 1A at 2015 Specialty Bond Projects.
Ridgeview ES Keyless Access Control Upgrade
Learn more about the Campus Keyless Access Control and Video Surveillance Camera Upgrades Project (69 Campuses) at 2015 Specialty Bond Projects.
2007 Bond
Ridgeview ES Kitchen Facility HVAC System Upgrades
Learn more about the Elementary School Kitchen Facility HVAC System Upgrades project at 2007 Specialty Bond Projects.
Ridgeview ES Metal Gym Replacement with Masonry Gyms & HVAC
Learn more about the Elementary School Metal Gym Replacement with Masonry Gyms & HVAC project at 2007 Specialty Bond Projects.
2003 Bond
Ridgeview ES Classroom Addition
The Ridgeview Elementary School Classroom Addition Project includes the following: (1) twenty-one (21) general purpose classrooms (~725 net sq. ft.), (2) two music rooms with storage areas replacing one music room located in a portable building and 1 music room located on the campus stage, (3) two restrooms adjoining each pair of general purpose classrooms per the standard elementary school prototype design, (4) supporting teacher resource areas consisting of a workroom, book storage area, faculty restrooms, and two resource rooms, (5) facility vestibule area and elevator, and (6) an athletic facility consisting of an oversized gymnasium with an athletic office, 2 storage areas and supporting general/public restroom areas to replace the existing metal gym along with a covered walkway connection from the new athletic facility to the new two-story academic building.
Planning Estimate1: $ 4,340,000
Start Date: April 30, 2005
End Date: July 2006
Architect: Lopez Salas Architects, Inc.
General Contractor: G.W. Mitchell & Sons, Inc.
Pictures: Aerial
Project Summary: (PDF Format)
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.
Ridgeview ES Re-Roofing and Roof-Related Work Project
This project addresses the Ridgeview ES Re-Roofing and Roof-Related Work Project, which includes a total roof replacement area of approximately 3,500 sq. ft. of roof area in the C-Wing classroom building.
Planning Estimate1: $346,258
Start Date: 2006
End Date: 2006
Architect: Wiss, Janney, Elstner Associates, Inc.
General Contractor: Bentley Sheet Metal and Roofing Co., Inc.
Pictures: Aerial
Project Summary:
- Bid Award Agenda Item (PDF)
- Bid Tab (PDF)
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs