Regency Place Elementary School Bond Projects

Regency Place Elementary School, North East ISD, (NEISD) San Antonio, Texas
Regency Place Elementary School
10222 Broadway
San Antonio, TX 78217
Map / Directions
Aerial/Construction Photos

2015 Bond

Regency Place ES Facility Addition and Renovations Project

2015 Bond Program Regency Place ES Construction-Manager-at-Risk Addition and Renovations Project
 
The 2015 Bond Program included funding to construct a new classroom addition at Regency Place Elementary School, replacing twenty-four portable classrooms with permanent facilities, and to provide selected renovations to the existing campus facilities. The design provided for construction of: (1) twenty-four new classrooms, including 22 general purpose classrooms with integrated restrooms, and two ALE Classrooms with an ALE Restroom; (2) music classroom, office, and storage area; (3) library and media center; (4) computer lab; (5) new administrative, counseling, and clinic areas with a secure entry vestibule at the campus main entrance area; (6) teacher resource and support areas; (7) covered walkways at the parent drop-off/pick-up area and bus loading/unloading area; (8) fire lane extension; (9) central plant expansion for the new classroom/library addition; (10) renovation of the existing administrative area into a family specialist program area; (11) renovation of existing classroom areas consisting of installation of new wall-partitions and replacement of any existing folding accordion partitions; and (12) landscaping, irrigation, drainage, site utilities, and infrastructure improvements to complement the new facility addition. The overall design program for this project consisted of 55,978 sq. ft. of new facility additions and 3,547 sq. ft. of interior renovations to support the family specialist program.
 
Planning Estimate1: $16,750,000
 
Start Date: October 2017
 
End Date: August 2019
 
O
 
General Contractor: Satterfield & Pontikes Construction
 
 
Project Summary (PDF Format):
 
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.

Regency Place ES New Paved Walking Track

Learn more about the #5.16 Elementary School Walking Tracks Project (37 Campuses) at 2015 Specialty Bond Projects.

Regency Place ES Keyless Access Control Upgrade

Learn more about the Campus Keyless Access Control and Video Surveillance Camera Upgrades Project (69 Campuses) at 2015 Specialty Bond Projects.

2007 Bond

Regency Place ES Roofing Program

This project addresses the Regency Place ES Re-Roofing and Roof-Related Work Project to replace the west classroom wing addition roof of the main building at Regency Place Elementary School measuring approximately 8,932 sq. ft.
 
Planning Estimate1: $284,150
 
Start Date: July 2009
 
End Date: September 2009
 
Wiss, Janney, Elstner Associates, Inc. - San Antonio
 
General Contractor: Beldon Roofing Company
Beldon Roofing Company - San Antonio
 
Project Summary:
 
 
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.

Regency Place ES Metal Gym Replacement with Masonry Gyms & HVAC

Learn more about the Elementary School Metal Gym Replacement with Masonry Gyms & HVAC at 2007 Specialty Bond Projects.

2003 Bond

Regency Place ES Roofing Program

Re-Roofing and Roof Related Work to replace the roof installed in 1969 at the Regency Place Elementary School over an area measuring approximately 35,583 square foot.
 
Planning Estimate1: $628,942
 
Start Date: July 13, 2005
 
End Date: September 23, 2005
 
Architect: Edis Oliver and Associates, Inc.
 
General Contractor: Mahone Roofing & Sheet Metal
 
Pictures: Aerial
 
Project Summary:
 
 
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.
 
 

>>>Previous Regency Place Elementary School Bond Projects<<<