Olmos Elementary School Bond Projects

Olmos Elementary School, North East ISD, (NEISD) San Antonio, Texas
Olmos Elementary School
1103 Allena Drive
San Antonio, TX 78213
Map / Directions
Aerial/Construction Photos

2015 Bond

Olmos ES Secure Entry Vestibule Additions and Renovations Project

Learn more about the #1.2 District Secure Entry Vestibule Additions and Renovations Project (19 Campuses) at 2015 Specialty Bond Projects.

Olmos ES Parking Lot Lighting Upgrade

Learn more about the District Facility Operations MEP Upgrades Bid Package 1A Project at 2015 Specialty Bond Projects.

Olmos ES Kitchen HVAC Upgrade

Learn more about the District Facility Operations MEP Upgrades Bid Package 2A Project at 2015 Specialty Bond Projects.

Olmos ES Special Education Restroom Renovation

Learn more about the #5.11 Special Education Restroom Renovations Project at 2015 Specialty Bond Projects.

Olmos ES New Paved Walking Track

Learn more about the #5.16 Elementary School Walking Tracks Project (37 Campuses) at 2015 Specialty Bond Projects.

Olmos ES Keyless Access Control and Video Surveillance Camera Upgrades

Learn more about the Campus Keyless Access Control and Video Surveillance Camera Upgrades Project (69 Campuses) at 2015 Specialty Bond Projects.

2010 QSC Bond

Olmos ES Roof Replacement and Roof-Related Work Project

This project addresses the Olmos Elementary School Roof Replacement and Roof-Related Work Project, which includes a total roof replacement area of approximately 20,063 sq. ft.
 
Planning Estimate1: $440,000
 
Start Date: May 2, 2013
 
End Date: September 3, 2013
 
Wiss, Janney, Elstner Associates, Inc. - San Antonio
 
General Contractor: A.D. Willis Company, Inc.
 
Project Summary:
 
 
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.

2007 Bond

Olmos ES Kitchen Facility HVAC System Upgrades

Learn more about the Elementary School Kitchen Facility HVAC System Upgrades at 2007 Specialty Bond Projects.

Olmos ES HVAC Upgrades for P.E./Athletic/Fine Arts Facilities

Learn more about the Elementary School HVAC Upgrades for P.E./Athletic/Fine Arts at 2007 Specialty Bond Projects.

2003 Bond

Olmos ES Classroom Addition

This project replaces the existing portable classroom buildings and restrooms with permanent facilities as well as construction of a permanent music classroom to replace the music classroom located on the campus stage. The project includes the following components: (1) twenty-two general purpose classrooms, (2) two music rooms with storage areas replacing one music room located in a portable building and 1 music room located on the campus stage, (3) a counselors office area equivalent in size to one classroom to replace the counselors area located in a portable building, (4) two restrooms adjoining each pair of classrooms per the standard elementary school prototype design, (5) supporting teacher resource areas consisting of a workroom, book storage area, faculty restrooms, and two resource rooms, (6) facility vestibule areas, (7) general use restrooms, and (8) the standard prototype elementary school athletic facilities consisting of 2 gyms, 1 athletic office, and 2 storage areas to replace the existing metal gym which conflicts with the optimal location for the new academic building.
 
Planning Estimate1: $4,650,000
 
Start Date: March 2005
 
End Date: June 2006
 
Architect: Chumney & Associates
 
General Contractor: Browning Construction Co.
 
Pictures: Aerial
 
Project Summary: (PDF Format)
 
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs

>>>Previous Olmos Elementary School Bond Projects<<<