Northern Hills Elementary School Construction Projects

13901 Higgins Road
San Antonio, TX 78217
Map / Directions
Aerial/Construction Photos
2015 Bond
Northern Hills ES Athletic Addition and Renovations Project

The 2015 Bond Program includes funding for upgrades to the Northern Hills Elementary School campus athletic facility. The 2015 Bond will provide for construction of the following program elements: (1) construct a covered pavilion (8,200 sq. ft.) over the outdoor play area adjacent to the gymnasium; (2) replace the existing asphalt play area with a concrete foundation/surface; (3) install a concrete drainage channel with safety handrail along the lower edge of the outdoor play area; (4) install new basketball goals for the outdoor play area; (5) replace side-court basketball goals and install 2 additional basketball goals at the gymnasium; (6) repaint gymnasium; (7) install LED lighting at the gymnasium; (8) install new HVAC mini-split system at the gymnasium coaches’ office; (9) renovate gymnasium restrooms to comply with TAS/ADA standards; (10) construct a small storage building (15 ft. x 17 ft.) adjacent to the outdoor play area for athletic equipment storage; and (11) install new District-furnished sound system in the gymnasium and at the outdoor play area. Use of the District’s Job Order Contract (JOC) is proposed as the bid/construction delivery method for this project.
Planning Estimate1 $975,000
Start Date: February 2018
End Date: August 2018
Architect: Shawn Kaarlsen and Associates
General Contractor: Satterfield & Pontikes Construction
Pictures: Aerial/Architectural
- Schematic Design Approval
- Board of Trustees Presentation - August 14, 2017
- Bid Authorization - December 11, 2017
- Pre-Proposal Conference (January 11, 2018) - Presentation (16 MB), Sign-In Sheet (PDF)
- Bid Award | Construction Cost Bid Summary | Subcontractor Bid Summary
Northern Hills ES New Paved Walking Track
Northern Hills ES Special Education Restroom Renovation
Northern Hills ES Fire Alarm Upgrade
Northern Hills ES Keyless Access Control Upgrade
2007 Bond
Northern Hills ES Roofing Program
The 2007 Bond Program includes funding for Re-Roofing and Roof Related Work to replace all sections of the original Northern Hills roof areas measuring approximately 54,140 sq.ft.
Planning Estimate1: $1,611,950
Start Date: April 2008
End Date: August 2008
Architect: Wiss, Janney, Elstner Associates, Inc.
General Contractor: Port Enterprises, Ltd.
Pictures: Aerial