Colonial Hills Elementary School Construction Projects
Colonial Hills Elementary School Bond Projects

Colonial Hills Elementary School
2627 Kerrybrook Court
San Antonio, TX 78230
Map / Directions
Aerial/Construction Photos
2627 Kerrybrook Court
San Antonio, TX 78230
Map / Directions
Aerial/Construction Photos
2015 Bond
Colonial Hills ES Kitchen Addition and Renovations Project

The 2015 Bond Program includes funding for the expansion and renovation of the Colonial Hills Elementary School campus kitchen facility. The 2015 Bond will provide for construction of the following program elements: (1) construct a kitchen addition (571 sq. ft.); (2) renovate the existing kitchen area (1,511 sq. ft.) to functionally blend the renovation area with the new kitchen addition; (3) construct two serving lines (595 sq. ft.) to support food service operations; (4) reconfigure the kitchen loading dock access road to facilitate deliveries by the food service delivery truck; and (5) construct various site improvements (landscape, irrigation, drainage, site utilities, and hardscape) to support the kitchen addition/renovations work. The design program for the 2015 Bond Colonial Hills Kitchen Addition and Renovations Project equals 2,677 sq. ft. of facility improvements, including 571 sq. ft. of facility additions and 2,106 sq. ft. of interior renovations. Use of the District’s Job Order Contract (JOC) is proposed as the bid/construction delivery method for this project.
Planning Estimate1: $2,275,000
Start Date: January 2018
End Date: April 2018
Architect: Lopez Salas Architects, Inc

General Contractor: Satterfield & Pontikes

Pictures: Aerial/Architectural
Project Summary:
- Schematic Design Approval (PDF)
- Board of Trustees Schematic Design Presentation - August 14, 2017 (PDF)
- Bid Authorization - October 9, 2017 (PDF)
- Bid Award and Bid Tab - December 11, 2017 (PDF)
|
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.
Colonial Hills ES Special Education Restroom Renovations
Learn more about the #5.11 Special Education Restroom Renovations Project (14 Campuses) at 2015 Specialty Bond Projects.
Colonial Hills ES Walking Track
Learn more about the #5.16 Elementary School Walking Tracks Project (37 Campuses) at 2015 Specialty Bond Projects.
Colonial Hills ES Secure Entry Vestibule Additions and Renovations Project
Learn more about the #1.2 District Secure Entry Vestibule Additions and Renovations Project (19 Campuses) at 2015 Specialty Bond Projects.
Colonial Hills ES Keyless Access Control and Video Surveillance Camera Upgrades
Learn more about the Campus Keyless Access Control and Video Surveillance Camera Upgrades Project (69 Campuses) at 2015 Specialty Bond Projects.
Colonial Hills ES Parking Lot Lighting Improvements
Learn more about the District Facility Operations MEP Upgrades Bid Package 1A Project at 2015 Specialty Bond Projects.
2007 Bond
Colonial Hills ES Kitchen Facility HVAC System Upgrades
Learn more about the Kitchen Facility HVAC System Upgrades Project at 2007 Specialty Bond Projects.
Colonial Hills ES Metal Gym Replacement with Masonry Gyms & HVAC
Learn more about the Metal Gym Replacement with Masonry Gyms & HVAC Project at 2007 Specialty Bond Projects.
2003 Bond
Colonial Hills ES Classroom Addition
The 2003 Bond Program includes funding for a major classroom addition at Colonial Hills Elementary School to replace the existing portable classroom buildings with permanent facilities. The project includes the following components: (1) twenty-seven general purpose classrooms (~ 725 net sq. ft.), (2) two music rooms with storage areas and an office, (3) restrooms adjoining each pair of general purpose classrooms per the standard elementary school prototype design, (4) supporting teacher resource areas consisting of a workroom, book storage area, faculty restrooms and two resource rooms, (5) an elevator and (6) the standard prototype athletic facility consisting of 2 gymnasiums with an athletic office, 2 storage areas and supporting restrooms to replace the existing metal gym facility along with a covered walkway connecting the new athletic facility to the main academic building.
Planning Estimate1: $5,140,000
Start Date: May 2005
End Date: July 2006
Architect: McChesney Architects
General Contractor: Greco Construction Co.
Pictures: Aerial
Project Summary:
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.