District Calendar
This Week's Menus
Staff Directory
NEISD School Sub Column 2nd Level
layout-sub-column-2nd-level
skip to main content
North East Independent School District
Transportation Central Bus Facility, North East ISD, (NEISD) San Antonio, Texas
Transportation Central Bus Facility
10214 Sommers Dr
San Antonio, TX 78217
The Transporation Central Bus Facilty has benefited from multiple bonds that have provided investments designed to support students, safety, and long-term facility quality. Bonds have established construction projects, supported facility improvements, replaced aging infrastructure, and modernized crucial systems that support essential daily operations. Over time, bond projects have helped develop a safer, more functional facilities that better serves students, staff, and families. As a result, bonds continue to strengthen North East ISD schools and our San Antonio community.

2015 Bond

Transportation Central Bus Terminal Facility Upgrades

The 2015 Bond Program includes funding to provide facility upgrades for the North East ISD Transportation Central Bus Terminal. The 2015 Bond will provide the following program elements: (1) Transportation foreman and coordinator’s office renovations (4,217 sq. ft.); (2) renovate interior shop bay areas, including: LED lighting retrofit, large ceiling fan installation, pull-down reels for distribution/use of service lubricants and compressed air, interior painting, work bench replacement, intercom system installation, storage area upgrades, and reseal concrete shop bay floors (20,210 sq. ft.); (3) renovate exterior shop bay areas by adding a canopy extension to the existing facility, constructing new heavy-duty driveway approaches, and install new high-pressure wash system (29,800 sq. ft.); and (4) upgrade transportation fueling station equipment. The total facility program for this project equals 54,227 sq. ft.

Planning Estimate1: $1,000,000

Start Date: September 2018

End Date: July 2019

Architect: Lopez Salas Architects, Inc.
Lopez Salas Architects, Inc. - San Antonio

General Contractor: Satterfield & Pontikes Construction
Satterfield & Pontikes - San Antonio

Project Summary: (PDF format)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.

2007 Bond

Transportation Central Bus Wash

The 2007 Bond includes a Bus Wash Facility to provide an efficient and functional method to wash and maintain the district busses and small vehicle fleet in a clean and cost effective manner. The bus washing facility includes an automated energy efficient operation and water reclamation system.

Planning Estimate1: $550,000

Start Date: December 2009

End Date: July 2010

Architect: Pape-Dawson Engineers
Pape-Dawson Engineers - San Antonio

General Contractor: F.A. Nunnelly Company

Project Summary: (PDF Format)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.