Stahl Elementary School Bond Projects

2025 Bond
- Direct Digital Controls (DDC) System Replacement/Upgrades
- Fire Alarm System Replacements/Upgrades
- HVAC System Upgrades - Roof-top Cooling Units
- Upgrades to all ES Playgrounds, replacing missing or damages parts /components, new rubberized accessible sidewalks within playground surround, fall protection (pea gravel), & new playground sunshade canopy fabric replacements. - Districtwide
- Upgrades to Parking Lots, Driveways, Parents/Student Drop-off & Pick-up Lanes - District wide
- Weatherization of all ES Walking Tracks - Districtwide (46 ES Campuses ~402,900SF Walking Track)
These projects are specific to this campus/facility. Districtwide bond projects also support students, staff and the NEISD community. View all bond projects to learn more.
2015 Bond
Stahl ES Secure Entry Vestibule
Stahl ES New Paved Walking Track
Stahl ES Roofing Maintenance
Typical roof life expectancies range from 20 to 30 years based upon several factors, which include: (1) quality of the roof product and construction installation; (2) wear and tear due to foot traffic for operations and maintenance access to rooftop equipment; and (3) long-term weather conditions and resultant impacts. This project addressed the Stahl Elementary School Re-Roofing and Roof-Related Work Project, which included a total roof replacement area of 90,135 sq. ft.
Planning Estimate1: $2,297,550
Architect: Wiss, Janney, Elstner Associates, Inc.
General Contractor: CS Advantage USAA Inc.
Pictures: Aerial
- Schematic Design Approval (PDF)
- Bid Authorization Approval (PDF)
- Bid Award and Bid Tab (PDF)
Stahl ES Parking Lot Lighting Upgrades
Stahl ES Keyless Access Control Upgrades
2007 Bond
Stahl ES Facilities HVAC Upgrades
Previous Bonds
1998 & 1995
- 1998 Bond Stahl ES Summary (PDF)
- 1995 Bond Stahl ES Summary (PDF)