Jackson-Keller Elementary School Bond Projects

Jackson-Keller Elementary School has benefited from multiple bonds that have provided investments designed to support student learning, campus safety, and long-term facility quality. Bonds have established construction projects, supported facility improvements, replaced aging infrastructure, and modernized crucial systems that support essential daily operations. Over time, bond projects have helped develop a safer, more functional campus that better serves students, staff, and families. As a result, bonds continue to strengthen North East ISD schools and our San Antonio community.
2015 Bond
Jackson-Keller ES New Paved Walking Track
Learn more about the #5.16 Elementary School Walking Tracks Project (37 Campuses) at 2015 Specialty Bond Projects.
Jackson-Keller ES Keyless Access Control and Video Surveillance Camera Upgrades
Learn more about the Campus Keyless Access Control and Video Surveillance Camera Upgrades Project (69 Campuses) at 2015 Specialty Bond Projects.
2007 Bond
Jackson-Keller ES Classroom Addition
The 2007 Bond Program included funding for construction of: (1) twenty-seven general instructional classrooms with integrated restrooms, (2) two pull-out classrooms supporting the music program, (3) new gym (+) with PE support facilities, (4) teacher support areas including three grade level workrooms, three book storage room and two conference rooms, (5) new bus loop, fire lane extension and campus parking expansion.
Planning Estimate1: $13,725,000
Start Date: April 15, 2009
End Date: August 15, 2010
Architect: Lopez Salas Architects, Inc.
General Contractor: G.W. Mitchell & Sons, Inc.
Pictures: Aerial/Architectural
Project Summary: (PDF Format)
- Property Map
- Bid Award Agenda Item
- Bid Tab
- Project Summary
- Architectural Renderings
- Site Plan
- Floor Plans
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.