Jimmy Littleton Gym Bond Projects

12002 Jones Maltsberger Rd
San Antonio, TX 78216
2010 QSC Bond
Littleton Gymnasium HVAC Upgrades
The 2010 QSC Bond Project at Blossom Athletic Center Littleton Gym Facility included: (1) replacing and upgrading all fourteen original HVAC air-handler and chilled-water piping systems; (2) upgrading the electrical switch-gear system and emergency power systems; (3) replacing the domestic hot-water heaters, main boiler, and hot-water piping systems; (4) replacing the existing fire alarm system; (5) installing HVAC systems in the dressing room areas; (6) upgrading the facility direct digital control system; (7) upgrading the competition lighting system over the main court area to 100 foot-candles; (8) upgrading the main arena ceiling system to a 2’x2’ grid; (9) upgrading the main facility sound system; and (10) replacing the existing scoreboards with a new scoreboard system.
Planning Estimate1: $3,650,000
Start Date: May 15, 2012
End Date: July 1, 2013
Architect: Silber & Associates Consulting Engineers, Inc.
General Contractor: Baron-Long Construction
Project Summary:
- Bid Award Agenda Item (PDF)
- Bid Tab (PDF)
Previous Littleton Gymnasium Construction Bond Projects
Littleton Gymnasium at Blossom Athletic Center
12002 Jones Maltsberger Rd
San Antonio, TX 78216
Map / Directions
Aerial/Construction Photos