2010 Project
Heroes Stadium - New Score Board
Added a new score board that has a 15 ft. by 25 ft. video board system and advertising panels. The new video and score boards will be paid by advertising funds generated by the sale of the advertising panels. Additionally, the video board system will generate revenue back to the district once advertising goals are met.
Planning Estimate1: $0
Start Date: May 2010
End Date: June 2010
Architect: RVK Architects

General Contractor: Daktronics Sports Marketing
Pictures: Aerial/Architectural
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.
2007 Bond
Heroes Stadium - New Stadium Facility
The 2007 Bond Program included funding to build a new athletic stadium at a 58.01 acre District owned site in the Longhorn Quarry area. The Project was designed and bid in multiple bid packages as follows: Package I provided for selection of the Construction Manager; Package II provided for the design of the New Athletic Stadium bleacher package, selection of the Bleacher Manufacturer and submission of the bleacher shop drawings; Package III provided for design and construction of the New Stadium foundation, structure and site utilities; Package IV provided for design and construction of the Architectural Facility Finish-Out, Civil Infrastructure, Mechanical-Electrical-Plumbing (MEP) Systems and Sports Turf Package for the New Athletic Stadium Facilities
Planning Estimate1: $27,500,000
Start Date: December 18, 2007
End Date: August 28, 2009
Architect: RVK Architects

General Contractor: Joeris General Contractors, Ltd.

Pictures: Aerial/Architectural
Project Summary: (PDF)