Comalander Football Stadium at Blossom Athletic Center Bond Projects

Comalander Football Stadium at Blossom Athletic Center, North East ISD, San Antonio, Texas
Comalander Football Stadium at Blossom Athletic Center
12002 Jones Maltsberger Rd
San Antonio, TX 78216
Map / Directions
Aerial/Construction Photos

2015 Bond

Comalander Stadium Facility Upgrades

Bid Package 1 Bleacher Replacement

The 2015 Bond Program includes funding to provide facility upgrades at the Comalander Stadium to (1) replace the existing east and west side bleachers (The east side stands were replaced between December 2016 and July 2017, while the west side stands were replaced between December 2017 and July 2018.); (2) construct two new field house locker rooms for the home and visitor teams; and (3) renovate the existing public restrooms located under the east/west bleachers.
Planning Estimate1: $3,275,000
Start Date: December 2016
End Date: July 2018
Architect: RVK Architects
General Contractor: Southern Bleacher Company
Project Summary:
 

Bid Package 2 Bleacher Demolition and Utilities Reconnection

The Bid Package 2 Bleacher Demolition and Utilities Reconnection Project will disconnect the existing utilities tied to the underside of the existing bleachers (i.e., mechanical, electrical, plumbing, and technology systems), demolish and remove the existing bleacher structural frame, seats, and ramps, and – following installation of the new bleacher system – reconnect utilities to reactivate all existing facility support systems.
Planning Estimate1: $1,045,000
Start Date: December 2016
End Date: June 2017
Architect: RVK Architects
General Contractor: Whiting-Turner Contracting Company
Project Summary:
 

Bid Package 3 New Field Maintenance Building Project

The 2015 Bond Program includes funding to provide facility upgrades at BAC Comalander Stadium. This project will relocate and replace the existing field maintenance building (2,500 sq. ft.) with a new metal building and outdoor covered work area. Construction of the new field maintenance building will occur between the baseball facility north-side visitor stands and Comalander Stadium.
Planning Estimate1: $1,175,000
Start Date: June 2017
End Date: January 2018
Architect: RVK Architects
General Contractor: F.A. Nunnelly Company
Project Summary:
 

Bid Package 4 New Field House Locker Rooms and Stadium Restroom Renovations

BAC Comalander Stadium New Field House
Bid Package 4 will construct 2 new field house locker rooms (home and visitor) at the south end of the stadium to replace the existing locker rooms located under the east/west bleachers, renovate the men’s and women’s public restrooms which serve Comalander Stadium, and provide various site infrastructure improvements to support the project. The total facility program for Bid Package 4 equals 13,392 sq. ft. which includes 10,992 sq. ft. for 2 new field houses and 2,400 sq. ft. for the stadium restroom renovations.
Planning Estimate1: $5,616,000
Start Date: December 2017
End Date: August 2018
Architect: RVK Architects
General Contractor: Joeris General Contractors
Project Summary (PDF format):
 
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.

Comalander Football Stadium - Replace Existing Artificial Turf Field

Learn more about the High School Sports Fields (Upgrade Main Football Field to Artificial Turf) and Athletic Tracks Life-Cycle Maintenance Projects at 2015 Specialty Bond Projects.

2010 Project

Comalander Football Stadium Score Board Replacement

The 2010 project replaced the existing score board with a new score board that has a 15 ft. by 25 ft. video board system and advertising panels. The new video and score boards were paid by advertising funds generated by the sale of the advertising panels. Additionally, the video board system generates revenue back to the district once advertising goals were met.
Planning Estimate1: $0
Start Date: July 2010
End Date: August 2010
Architect: RVK ArchitectsRVK Architects - San Antonio
General Contractor: Daktronics Sports Marketing
 
 | 
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.