Heroes Stadium - New Stadium Facility
The 2007 Bond Program included funding to build a new athletic stadium at a 58.01 acre District owned site in the Longhorn Quarry area. The Project was designed and bid in multiple bid packages as follows: Package I provided for selection of the Construction Manager; Package II provided for the design of the New Athletic Stadium bleacher package, selection of the Bleacher Manufacturer and submission of the bleacher shop drawings; Package III provided for design and construction of the New Stadium foundation, structure and site utilities; Package IV provided for design and construction of the Architectural Facility Finish-Out, Civil Infrastructure, Mechanical-Electrical-Plumbing (MEP) Systems and Sports Turf Package for the New Athletic Stadium Facilities
Planning Estimate1: $27,500,000
Start Date: December 18, 2007
End Date: August 28, 2009
Architect: RVK Architects
General Contractor: Joeris General Contractors, Ltd.
Pictures: Aerial/Architectural
Project Summary: (PDF)
- Heroes Stadium Story
- Heroes Stadium - Inaugural Year
- Heroes Stadium Brochure
- Bid Award Agenda Items
- Project Summary
- Architectural Renderings
- Site Plan
- Floor Plans
Construction Bonds | CM&E Home
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.