NEISD BAC Tennis Center Courts Expansion and Facility Upgrades Project

The 2015 Bond Program included funding at the BAC Tennis Center to provide selected facility improvements. The 2015 Bond provided for construction of the following program elements: (1) construct four new tennis courts to bring the facility total to eighteen courts; (2) resurface twelve of the existing fourteen tennis courts and add a petro-mat underlayment to help minimize surface cracking; (3) upgrade the existing tennis center facility courts lighting system to improve night-play lighting levels; (4) construct new facility entrance canopy; and (5) construct various site infrastructure improvements (landscape, irrigation, drainage, site utilities, and hardscape) to support the overall project.
Planning Estimate1: $4,500,000
Start Date: October 2017
End Date: April 2018
Architect: RVK Architects
General Contractor: Marksmen General Contractors
Pictures: Aerial/Architectural
Project Summary:
- Schematic Design Approval (PDF)
- Board of Trustees Presentation - August 14, 2017 (PDF)
- Bid Authorization Approval (PDF)
- Bid Award (PDF) | Bid Tab (PDF)

Concrete Pour - 2015 Bond Blossom Athletic Center Tennis Courts (April 2018)
Construction Bonds | CM&E Home
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.