LEE HS CTE and STEM Renovations

The 2015 Bond Program included funding to continue implementation of the Legacy of Educational Excellence High School Master Redevelopment Project and provide new modernized facilities for the campus. The 2015 Bond continued the campus redevelopment plan and provided for construction of the following program elements in support of the Career and Technical Education (CTE) and Science, Technology, Engineering, and Math (STEM) Programs by renovation of the existing Home Economics Facility (Building 700), Science Facility (Building 800), and Dance Facility (Metal Building 21) into new CTE and STEM facilities housing 15 classroom/lab areas which comprise the following programs: (1) CTE Culinary Arts; (2) CTE Cosmetology; (3) CTE Family & Consumer Science; (4) CTE Criminal Justice; (5) CTE Health Science; (6) CTE Technology Education; (7) CTE Business Marketing; (8) CTE Shared Computer Lab; (9) STEM Technology Education; (10) STEM Robotics Engineering; and (11) STEM Robotics Manufacturing. Additionally, an existing teacher workroom in the main academic facility (Building 100) was renovated into the STEM Faculty Office Area. The Schematic Design Program for this project includes a total of 32,000 sq. ft. of campus building renovations.
Planning Estimate1: $7,000,000
Start Date: January 2017
End Date: May 2020
Architect: Pfluger Associates Architects
General Contractor: Baron-Long Construction
Pictures: Aerial/Architectural
Project Summary:
- Schematic Design Approval (PDF)
- Board of Trustees Schematic Design Presentation - September 12, 2016 (PDF - 6 MB)
- Bid Authorization (PDF)
- Bid Award and Bid Tab (PDF)
Construction Bonds | CM&E Home
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.