LEE HS Parking Lot Expansion

The 2015 Bond Program includes funding to renovate the existing campus 2-story science building for use as a Career and Technology Education (CTE)/Science Technology Engineering Mathematics (STEM) Program Facility and construct a new campus Fine Arts Facility with Performing Arts Theater to address programmatic requirements for both the Legacy of Educational Excellence (LEE) High School and North East School of the Arts (NESA) Fine Arts Programs. As this project will continue expanding the LEE High School facility footprint, the need for additional parking on-campus is a critical planning requirement. Phase I of the overall 2015 Bond LEE High School Additions and Renovations Project will increase the parking capacity at the main front entrance from 16 to 40 spaces (net increase of 24 spaces) which includes 36 car and 4 motorcycle parking stalls.

Planning Estimate1: $225,000

Start Date: June 3, 2016

End Date: August 20, 2016

Engineer: MTR Engineers

General Contractor: Clearfield Construction, LLC

Project Summary:

Construction Bonds | CM&E Home

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.