information for the community

2011 Bond Project
White Middle School Athletic Facility Addition and Renovation


Project Details
Scope:
Includes funding to build new athletic support facilities at White Middle School and reuse either the existing competition gym or auxiliary gym within the design concept. The design provides for construction of the following: (1) new competition gymnasium; (2) boys' and girls' athletic and P.E. locker room and storage areas; (3) men and women coaches' office areas; (4) weight room; (5) laundry room; (6) lobby, public restrooms, and concession stand; (7) fire lane extension; (8) parking lot expansion; (9) landscaping, irrigation, drainage, site utilities, and infrastructure improvements to complement the new athletic facility addition; (10) two outdoor basketball courts; and (11) an outdoor athletic storage and restroom facility. Additionally, designed as a bid alternate, the existing locker room areas will be renovated into eight classrooms to replace the existing eight portable classrooms at the campus. The total campus facility program equals 33,547 sq. ft. with 26,867 sq. ft. designated for the new athletic facility addition/renovation and 6,680 sq. ft. for the locker room renovation and conversion into classrooms.
Planning Estimate 1:
$ 10,400,000
Start Date:
May 2014
End Date:
February 2016
Photo Gallery:
Aerial Photos
Architect:
Pfluger Associates Architects
Pfluger Associates Architects
General Contractor:
Bartlett Cocke General Contractors
Bartlett Cocke
Project Summary PDFs:

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.