2011 Bond Project
White Middle School Athletic
Facility Addition and Renovation
Scope: |
Includes funding to build new athletic support facilities at White Middle School and reuse either the existing competition gym or auxiliary gym within the design concept. The design provides for construction of the following: (1) boys' and girls' athletic and P.E. locker room and storage areas; (2) men and women coaches' office areas; (3) weight room; (4) laundry room; (5) lobby, public restrooms, and concession stand; (6) new competition gymnasium; (7) fire lane extension; (8) parking lot expansion; (9) landscaping, irrigation, drainage, site utilities, and infrastructure improvements to complement the new athletic facility addition; and (10) an outdoor athletic storage and restroom facility. The total facility program equals 30,000 sq. ft. for the new athletic facility addition. Additionally, the District staff recommends, as a bid alternate, that the existing locker room areas be renovated into eight classrooms to replace the existing eight portable classrooms at the campus. The resulting Bond facility program will be revised to include 6,283 sq. ft. in campus renovations. |
Planning Estimate 1: |
$ 10,400,000 |
Start Date: |
May 2014 |
End Date: |
February 2016 |
Photo Gallery: |
Aerial Photos |
Architect: |
Pfluger Associates Architects |
General Contractor: |
TBA |
Project Summary: |
Schematic Design Presentation (PDF) Schematic Design Approval (PDF) |
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.