2003 Bond Project:
White Middle School
Science and Clinic Addition and Renovations
Scope: |
Nurse's Clinic Expansion & Renovation. New Science Lab Facility: 8 Science Labs, 1 Centralized Chemical Storage Area, 3 Preparatory Storage Areas (1 adjacent to each Grade-Level), 2 Faculty Restrooms Upgraded, Science Department Offices (1 Office, 1 Workroom), Safety Equipment integrated in Labs and Prep Areas, Connect New One-Story Prototype Facility to existing Facilities through a Covered Walkway. |
Planning Estimate 1: |
$ 4,731,887 |
Start Date: |
May 2005 |
End Date: |
November 2006 |
Photo Gallery: |
Aerial Photos |
Architect: |
Garza Bomberger & Associates |
Architect: |
O'Neill Conrad Oppelt Architects, Inc. |
General Contractor: |
Bartlett Cocke General Contractors |
Project Summary: |
Bid Award Agenda Item (PDF) Bid Tab (PDF) Project Summary (PDF) Architectural Renderings (PDF) Site Plan (PDF) Floor Plans (PDF) |
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.