2003 Bond Project: Walzem Elementary School
Classroom Addition


Project Completed
Project Details
Scope:
This project will provide for the following: (1) twenty-eight general purpose classrooms (~ 725 net sq. ft.), (2) two music rooms with storage areas and an office, (3) restrooms adjoining each pair of general purpose classrooms per the standard elementary school prototype design, (4) supporting teacher resource areas consisting of a workroom, book storage area, faculty restrooms, and two resource rooms, (5) facility vestibule area and elevator, and (6) twenty additional parking spaces, and (7) fire lane extension through the rear area of the campus with a covered walkway for Parent Drop-off.
Planning Estimate 1:
$ 5,420,000
Start Date:
April 2005
End Date:
September 2006
Photo Gallery:
Aerial Photos
Architect:
Demunbrun-Scarnato Associates
General Contractor:
Bartlett Cocke General Contractors
Bartlett Cocke, Inc.
Project Summary:
Bid Award Agenda Item (PDF)
Bid Tab (PDF)
Project Summary (PDF)
Site Plan (PDF)
Floor Plans (PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.