2010 QSCB Project:
Littleton Gymnasium
HVAC Upgrades Projects
Scope: |
This project at Blossom Athletic Center Littleton Gym Facility includes: (1) replacing and upgrading all fourteen original HVAC air-handler and chilled-water piping systems; (2) upgrading the electrical switch-gear system and emergency power systems; (3) replacing the domestic hot-water heaters, main boiler, and hot-water piping systems; (4) replacing the existing fire alarm system; (5) installing HVAC systems in the dressing room areas; (6) upgrading the facility direct digital control system; (7) upgrading the competition lighting system over the main court area to 100 foot-candles; (8) upgrading the main arena ceiling system to a 2’x2’ grid; (9) upgrading the main facility sound system; and (10) replacing the existing scoreboards with a new scoreboard system. |
Planning Estimate 1: |
$ 3,650,000 |
Start Date: |
May 15, 2012 |
End Date: |
July 1, 2013 |
Photo Gallery: |
Aerial Photos |
Architect/Consultant: |
Silber & Associates Consulting Engineers, Inc. |
General Contractor: |
Baron-Long Construction |
Project Summary: |
Bid Award Agenda Item (PDF) Bid Tab (PDF) |
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.