information for the community

2010 QSCB Project: Littleton Gymnasium
HVAC Upgrades Projects

Project Completed
Project Details
Scope:
This project at Blossom Athletic Center Littleton Gym Facility includes: (1) replacing and upgrading all fourteen original HVAC air-handler and chilled-water piping systems; (2) upgrading the electrical switch-gear system and emergency power systems; (3) replacing the domestic hot-water heaters, main boiler, and hot-water piping systems; (4) replacing the existing fire alarm system; (5) installing HVAC systems in the dressing room areas; (6) upgrading the facility direct digital control system; (7) upgrading the competition lighting system over the main court area to 100 foot-candles; (8) upgrading the main arena ceiling system to a 2’x2’ grid; (9) upgrading the main facility sound system; and (10) replacing the existing scoreboards with a new scoreboard system.
Planning Estimate 1:
$ 3,650,000
Start Date:
May 15, 2012
End Date:
July 1, 2013
Photo Gallery:
Aerial Photos
Architect/Consultant:
Silber & Associates Consulting Engineers, Inc.
General Contractor:
Baron-Long Construction
Project Summary:
Bid Award Agenda Item (PDF)
Bid Tab (PDF)


1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.