2007 Bond Project:
MS/HS Facilities HVAC Upgrades
Bid Package V
Scope: |
Bid Package V: HVAC Upgrades at Driscoll, Eisenhower and Jackson Middle Schools for an HVAC program square footage equaling 80,686 sq. ft |
Planning Estimate 1: |
$ 4,850,000 |
Start/End Date: |
Construction Implementation Schedule (PDF) |
Photo Gallery: |
Construction Photos |
Engineer: |
Silber & Associates |
General Contractor: |
Joeris General Contractors, Ltd. |
Project Summary: |
Project Summary (PDF) Bid Award (PDF) Bid Tab (PDF) |
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.