2007 Bond Project:
Elementary School HVAC Equipment Package


Project Completed
Project Details
Scope:
This HVAC Equipment Package (80 units varying in size from 3 to 15 to 20 tons) provides for all DX Rooftop HVAC equipment in support of both the Elementary Schools HVAC Upgrades and Metal Gym Replacement Projects
Planning Estimate 1:
$ 1,388,600
Architect:
MEP Engineering, Inc.
Mechanical, Electrical, & Plumbing Engineering
General Contractor:
Texas Air Systems
Project Summary:
Bid Award Presentation (PDF)
Bid Tab (PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.