Bond Project: Specialty Projects


2003 Bond Program: Middle School Science Labs

Project Completed
Project Details
Scope:
  • New Science Lab Facilities at 8 Middle School Campuses and Clinic Expansion/Renovations at 2 Campuses:
    • Middle School Science Lab Campuses:
      • Bradley, Eisenhower, Jackson, Garner, Krueger, Nimitz, White, and Wood
    • Each Science Lab Facility includes:
      • 8 Science Labs
      • Centralized Chemical and Preparatory Storage Areas
      • Science Department Offices
      • Safety Equipment
    • Middle School Clinic Expansion/Renovation Campuses:
      • Driscoll and White
  • Connect Facility to existing Facilities through a Covered Walkway or Connecting Corridor
  • Eisenhower Campus – Admin Area Expansion/Renovation
  • White Campus – Clinic Expansion/Renovation
  • Driscoll Campus – Clinic Expansion/Renovation
Planning Estimate 1:
$ 38,750,000
Start Date:
August 15, 2005
End Date:
March 31, 2008
Architect:
Garza Bomberger & Associates
Garza Bomberger and Associates
Architect:
O'Neill Conrad Oppelt Architects, Inc.
O'Neill Conrad Oppelt Architects, Inc.
General Contractor:
Bartlett Cocke General Contractors
Bartlett Cocke
Project Summary:
Bid Award Agenda Item (PDF)
Bid Tab (PDF)
Project Summary (PDF)
Architectural Renderings
Site Plan (PDF)
Floor Plans (PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.