2003 Bond Project:
Regency Place ES
Roofing Program
Scope: |
Re-Roofing and Roof Related Work to replace the roof installed in 1969 at the Regency Place Elementary School over an area measuring approximately 35,583 square foot. |
Planning Estimate 1: |
$ 628,942 |
Start Date: |
July 13, 2005 |
End Date: |
September 23, 2005 |
Photo Gallery: |
Aerial Photos |
Architect: |
Edis Oliver and Associates, Inc. |
General Contractor: |
Mahone Roofing & Sheet Metal |
Project Summary: |
Bid Award Agenda Item (PDF) Bid Tab (PDF) |
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.