2003 Bond Project: Regency Place ES
Roofing Program


Project Completed
Project Details
Scope:
Re-Roofing and Roof Related Work to replace the roof installed in 1969 at the Regency Place Elementary School over an area measuring  approximately 35,583 square foot.
Planning Estimate 1:
$ 628,942
Start Date:
July 13, 2005
End Date:
September 23, 2005
Photo Gallery:
Aerial Photos
Architect:
Edis Oliver and Associates, Inc.
General Contractor:
Mahone Roofing & Sheet Metal
Project Summary:
Bid Award Agenda Item (PDF)
Bid Tab (PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.