2011 Bond Project
MacArthur High School Facility Additions/Renovations
Scope: |
Provide the following major project components: (1) new science and classroom addition to replace 7 portable buildings; (2) athletic facility expansion; (3) new JROTC Facility; (4) central plant air-cooled chiller and pump replacement; and (5) an athletic field outdoor restroom and concession stand facility. The total facility program equals 80,875 sq. ft. |
Planning Estimate 1: |
$ 25,125,000 |
Start Date: |
April 2014 |
End Date: |
October 2016 |
Photo Gallery: |
Aerial Photos |
Architect: |
Garza Bomberger & Associates |
General Contractor: |
Guido Construction Company![]() |
Project Summary: |
Construction Manager at Risk Selection Bid Award | Bid Tab Schematic Design and Bid Delivery Method Approval (PDF) |
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.