2003 Bond Project: Lopez Middle School
New School


Project Completed
Project Details
Scope:
New Middle School with over 200,000 square feet divided succintly in three "houses"-- one each for 6th, 7th, and 8th grades.
Planning Estimate 1:
$ 33,050,614
Start Date:
January 2005
End Date:
December 2006
Photo Gallery:
Aerial Photos
Architect:
Pfluger Associates Architects
Pfluger Associates Architects
General Contractor:
Joeris General Contractors, Ltd.
Joeris General Contractors, Ltd.
Project Summary:
Note: Lopez MS was referred to as "Hardy Oak MS" in the design phase.
Property Map (PDF)
Bid Award Agenda Item (PDF)
Bid Tab (PDF)
Project Summary (PDF)
Architectural Renderings (PDF)
Site Plan (PDF)
Floor Plan (PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.