2003 Bond Project: Lee High School
Classroom Addition


Numerous questions have arisen concerning replacement of the Lee High School JROTC Facility. This project was not included in either the 2003 or 2007 Bond Programs as developed, presented and approved by the voters of the North East Independent School District. However, because of the identified need to replace this aging facility, the Lee High School JROTC Replacement project was considered for possible inclusion in both the 2003 and 2007 Bond Programs using Bond Interest Earned funds to complete the replacement project. In the case of both the 2003 and 2007 Bond Programs, insufficient Bond Interest Earned funds were ultimately available to move forward with this project.

For the 2011 Bond Proposal, as adopted by the Board of Trustees in August 2011, the Lee High School JROTC Facility was formally and specifically included in the project improvements planned for the Lee High School campus, and will be constructed as part of the 2011 Bond Program. The existing Lee High School JROTC Facility will be replaced with a new, modernized facility.


Project Completed
Project Details
Scope:
Major classroom addition: New 3-Story Academic Building, New HS Administrative Offices / Career & Counseling Areas, New Student Health Clinic, New Athletic Fields & Parking at Basse-McCullough, New Teacher Resource Areas (1 per ~15 Classrooms), New Entry Vestibule and General Restroom Facilities.
Planning Estimate 1:
$ 27,750,000
Start Date:
May 2005
End Date:
July 2007
Photo Gallery:
Aerial Photos
Architect:
Bradley Architects
General Contractor:
Bartlett Cocke General Contractors
Bartlett Cocke, Inc.
Project Summary:
Bid Award Agenda Item
Bid Tab
Project Summary
Site Plan
Floor Plans

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.