Scope:
This project will replace the roof installed in 1973 at the Jackson Middle School main academic building over an area measuring approximately 85,000 sq. ft.
Planning Estimate 1:
$ 1,703,944
Start Date:
June 1, 2004
End Date:
September 22, 2004
Photo Gallery:
Aerial Photos
Architect:
Edis Oliver and Associates, Inc.
General Contractor:
Bentley Sheet Metal and Roofing
Project Summary:
Bid Award Agenda Item (PDF)
Bid Tab (PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.